Expansion and improvements to the wastewater and solids handling facilities at the Palo Alto Regional Water Quality Control Plant. Scope included new Sludge Dewatering and Loadout Facility, new BFP Feed Pumps and Odor Control System at the TS Blending and Pumping Facility, new pad-mount electrical switch and transformer, new diesel standby generator and load bank, and demolition of existing BFP Feed Pumps. Sitework, roads, site drainage, erosion control, site piping, electrical work, instrumentation, and controls also provided.