Construction of a new 6 MGD treatment plant. The project included all wastewater treatment processes from headworks through UV disinfection. Solids management was handled through aerobic digesters and screw presses. New buildings include a 3,200 SF administration building containing a laboratory, electrical power, instrumentation, and facilities. Two pre-engineered metal buildings were also provided: a 2,400 SF maintenance building housing vehicle and equipment service area, and office space, plus a 1,800 SF covered equipment cleaning and storage area. Site work included over 500 precast piles and buildingsite grade up to provide 100 year flood protection. American Society of Civil Engineers (ASCE) Sacramento Section’s Wastewater Project of the Year award winner.