This expansion of the Manteca Water Quality Control Facility (WQCF) was design to provide 10 MGD of title 22 recycled water. Construction included a influent pump station equipped with Floway VTPs, Aqua Aerobics tertiary filters, Wedeco UV disinfection, chemical handling facility, a 7-million-gallon HPDE lined and covered effluent equalization pond, covered primary sedimentation basins, odor control biofilters, a truck fill station, emergency generator, and site improvements.