Design and construction of a 4-story parking structure built directly across from the airport terminal. The parking structure has a footprint of 80,300 SF and is 318,000 gross square feet in total. The facility utilizes a new automated parking guidance system, which includes intuitive wayfinding and signage system, license plate recognition software, as well as automated payment and revenue control systems. Overaa’s self performing concrete abilities enabled us to work efficiently on forming and pouring the decks, beams, and columns. The result was one of the most time saving parking structures built in Overaa’s history. The Airport and adjacent parking lots remained open during construction – we worked closely with the Airport Facility team to minimize construction impacts.