Cliff Deck Parking Structure, Roseville Galleria

Overaa self performed this hybrid precast parking structure new, design build, 5-level parking structure for the retail mall site, Roseville Galleria. Overaa completed this project with an extremely accelerated 10-month schedule. We placed 30,000 square feet of elevated concrete deck per week. The structure has 1,382 stalls. The retail mall was opened and accessible during construction.