COVID-19 Update: We are continuing operations with added safety measures

Manteca WQCF Phase III Expansion

This expansion of the Manteca WQCF was design to provide 10 MGD of title 22 recycled water. Construction included a influent pump station equipped with Floway VTPs, Aqua Aerobics tertiary filters, Wedeco UV disinfection, chemical handling facility, a 7-million-gallon HPDE lined and covered effluent equalization pond, covered primary sedimentation basins, odor control biofilters, a truck fill station, emergency generator, and site improvements.