Construction of a 241,750 SF parking structure with 3,500 SF of office space on the ground floor. The four-level facility was built was in operating hospital site – extensive coordination was required to mitigate impacts of construction on the adjacent occupied facilities. We assisted the Owner in making critical design decisions based on construction costs. This included establishing a better site on campus to place the 757-stall garage, which helped save costs and allowed for a faster schedule. Overaa self-performed layout, structural excavation, foundations, slab-on-grade, and vertical concrete placement.