Kaiser Oakland Garage #1

Project Details

3″-6″ thick mat slab foundation for a six-level (two below grade), 531-stall parking structure that Overaa built. We placed 5,339 CY of concrete for the foundation over a 24-hour period. This required 594 deliveries – one every 1.6 minutes with 66 mixer trucks. We self-performed the foundation and placing of all vertical concrete. Adjacent occupied buildings with a limited laydown area.

Owner
Kaiser
Location
Oakland, CA
  • Doug Espland

    Doug Espland

    Vice President

  • "I grew to appreciate Overaa's management model, your thoughtful work ethic, and the careful and professional manner in which each member of Overaa's team carried out their responsibilities."

    Gary Bankhead

    Senior Project Manager Kaiser Permanente
  • I want to thank you for all the good work you and your team did on Kaiser's new garage at 3751 Broadway in Oakland. The job was certainly a success and Overaa's performance was outstanding. The project was built on a very tight site which made for a difficult build out.  And complicating the work, there were important relationships that had to be maintained with the city, and with the other contractor immediately adjacent to the garage site, in order for this job to be successful.  You, Doug and Duane did a wonderful job of keeping progress going in spite of all the difficult challenges thrown your way. I grew to appreciate Overaa's management model, your thoughtful work ethic, and the careful and professional manner in which each member of Overaa's team carried out their responsibilities. And as further acknowledgement to your success, I have heard from both Kaiser members, and employees, of how happy they are to be in this new facility.  You have done a great job. Thanks!

    Gary Bankhead

    Senior Project Manager,Kaiser Permanente