Expansion transforming a retail space into a 26,000 SF state-of-the-art medical facility. Major tenant improvements were required. This included demolition and abatement, new MEP and fire sprinkler systems, structural systems and seismic upgrades, new interior and exterior improvements, roofing, and site work. Seismic upgrades involved the installation of tie-backs and full structural underpinning of existing foundation systems. Major coordination with neighboring businesses was needed to minimize impacts to their respective operations. The new floor plan design optimizes staff efficiencies and patient flow by co-locating all services within one facility. The new two-story facility includes conference rooms, staff break areas, and offices for administration.