Los Esteros Power Plant

Project Details

Concrete foundation work, plus underground utility and sitework, for a power plant expansion. Overaa placed a total of 4,050 CY of concrete on this project. For a cooling tower basin slab, 270 CY of concrete was placed at a pace of 60 CY per hour using 27 concrete trucks.

 

Owner
Calpine
Location
San Jose, CA
Engineer
LG Constructors