Scotts Valley Middle School

Project Details

The new phased campus and modernization project consisted of 52,400 SF of new and renovated campus construction. The scope of the work includes the new construction of a library building, an administration building (modular construction), three classroom buildings (including pre-fabricated components), a gymnasium and locker rooms; and the modernization of three classroom wings and the multi-purpose building. Overaa sequenced an accessible path to ensure full access throughout the occupied campus. The phased construction allowed completed areas of the campus to be turned over to the school while the next phase was in construction. The project also included extensive sitework and the resurfacing of existing backetball courts.

Owner
Scotts Valley Unified School District
Location
Scotts Valley, CA
  • Mike Conrad

    Mike Conrad

    Vice President