52,400 SF of new and renovated campus construction. New construction included gymnasium and locker rooms, library building, administration building (modular construction), and three classroom buildings (including pre-fabricated components). Modernization covered three classroom wings and the multipurpose building. Overaa sequenced an accessible path to ensure full access throughout the occupied campus. Phased construction allowed completed areas of the campus to be turned over to the school while the next phase was in construction. The project also included extensive sitework and the resurfacing of existing backetball courts.
Scotts Valley Middle School
52,400 SF of new and renovated campus construction. New construction included gymnasium and locker rooms, library building, administration building (modular construction), and three classroom buildings (including pre-fabricated components). Modernization covered three classroom wings and the multipurpose building. Overaa sequenced an accessible path to ensure full access throughout the occupied campus. Phased construction allowed completed areas of the campus to be turned over to the school while the next phase was in construction. The project also included extensive sitework and the resurfacing of existing backetball courts.