New construction of a 25,000 SF charter school campus with a collaborative environment design. It is arranged as a series of courtyards with a central open space that features a stage and amphitheater to serve as the primary gathering area. Five classroom buildings, each containing a cluster of four classrooms, are arranged around a series of grade-level courtyards. Also provided were admin and multi-purpose buildings, outdoor play area, secured pick-up/drop-off area, and staff parking. The multi-purpose building includes a gym, which can also be used for school and community events, as well as a music room and servery. Sitework covered grading, ac paving, concrete sitework, landscaping, and site utilities. Landscaping takes into account water conservation through bio-swales, pervious paving, and use of native California plants. The buildings are solar ready. Overaa self performed building foundations, wood framing, exterior blocking, and sheathing.