Project Details

Upon groundbreaking, the Jones Memorial United Methodist Church was the largest church project undertaken in San Francisco in decades. The project required 20 to 24 feet of excavation because of its below-grade parking. The structure is supported by a post-tension concrete slab. The sanctuary is specially designed so it can also be used as a recording studio.

Location
San Francisco, CA
Architect
HKIT Architects
Square Footage
30,000