Monta Vista High School New Student Center & Quad Modernization
New 44,200 SF two-story student center plus renovation, reconfiguration, and reconstruction of the student quad and front drop-off area. The new student center features a college-style cafeteria and kitchen equipped with several stove tops, exhaust hoods, refrigerators, and monitor screens to display menus. The facility also houses programming and physics labs, restrooms, an electrical room, […]
John Swett High School, Phase I & II
New Administrative/Classroom Building and Arts Department, plus additions and modernization of an occupied campus. Phase I included modifications and additions to the existing buildings. Extensive interior renovations included: doors; windows; glazing; curtain walls; cabinets; acoustical tile and gypsum board ceilings; bathrooms; finishes including flooring, painting, ceramic tile, other wall coverings and wall base; and replacement […]
Sankofa Academy, Washington Elementary School, Phase I & II
Modernization of a 42,340 SF elementary school building completed in two, eight week sessions over two summer breaks. Scope covered two-stories plus basement cafeteria. 14 classrooms, auditorium, library, warming kitchen, administrative and support spaces, plus a licensed kindergarten were renovated. Additional scope covered site work, electrical systems upgrade, fire alarm replacement, interior finishes and window […]
Evergreen Valley College Automotive Technology Building
New 39,250 SF high performance facility for hands on learning. The facility features thirty automobile bays, lecture rooms/classrooms, teacher offices, and an outdoor patio. The bays contain specialty equipment such as lifts, utilities, exhaust hoods, and upgraded mechanical systems. A tool room, engine machine shop, engine cleaning room, fuel and electrical lab, and smog testing […]
Scotts Valley Middle School
52,400 SF of new and renovated campus construction. New construction included gymnasium and locker rooms, library building, administration building (modular construction), and three classroom buildings (including pre-fabricated components). Modernization covered three classroom wings and the multipurpose building. Overaa sequenced an accessible path to ensure full access throughout the occupied campus. Phased construction allowed completed areas […]
De Anza College – Flint Parking Structure Seismic Repairs
DSA coordinated project involving the seismic upgrade and renovation of an existing 500,000 SF parking structure on an occupied college campus. We removed portions of the existing foundations and added enlarged foundations, shear walls and tie-beams to the four-level, 1,800 stall facility. Scope also covered additional upgrades to the exterior and interior of the structure […]
Lynbrook High School Field House
Addition of a new 9,000 SF physical education and dance studio, plus renovations on the occupied campus. The new Field House contains a physical education classroom, weight and cardio room, dance and fitness room and additional support spaces. Renovations included a complete interior renovation of the restrooms, and installation of a new roof and exterior […]
Piedmont High School STEAM Building
New three-story STEAM classroom building on a occupied campus. The 42,700 SF facility features spacious, beautifully lit areas for students to practice problem-solving skills through hands-on learning. This includes ultra-modern science labs, computer science labs, engineering lab with a patio for outdoor instruction, classrooms, and art rooms with a patio for 2-D and 3-D art […]
Carquinez Middle School
Replacement campus project on the same site as the fully active middle school campus in Crockett, CA. The new middle school includes a ~47,000 SF, three-story building featuring admin offices, library, classrooms, gym with auditorium, plus cafeteria and kitchen. The façade features beautifully handcrafted sugar cane etchings in honor of Crockett’s rich history involving sugar […]