John Swett High School, Phase I & II

Project Details

This lease-leaseback project consists of modifications and additions to the existing buildings, construction of administration office and auditorium additions and site improvements and structures at John Swett High School. Overaa provided preconstruction and construction services. Site scope of work includes demolition of east cloister (connector) corridor between existing Buildings C and E. Scope of work to Buildings D and F include foundations, retaining walls, walls, roofs, doors, windows, glazing, curtain walls, cabinets, acoustical tile and gypsum board ceilings, two (2) toilet rooms and finishes including flooring, painting, ceramic tile, other wall coverings and wall base.  The project will be constructed in accordance to the California Department of Education and District guidelines and DSA approval process of the Department of General Services.

Owner
John Swett Unified High School District
Location
Crockett, CA