Roosevelt Middle School Modernization
Modernization of the main classroom building and structural upgrade to the theater to meet current safety guidelines and general improvements to the learning spaces throughout the building. Scope also includes Interim Housing fit out and site utilities and permanent Modular Science & Restroom Buildings work including earthwork and concrete foundation, fit out and site utilities.
Orinda Intermediate School Student Services Building
The phased lease-leaseback project includes the demolition the of the existing 10’s wing and preconstruction and construction services for the new 6,395 SF Student Services Building in its place. The Student Services Building will house administration, counselors, and a wellness center. The scope of work also includes the construction of a covered walkway, and sitework […]
Las Positas College Public Safety Complex & Advanced Manufacturing Transportation Facility
The Public Safety Complex (PSC) and Advanced Manufacturing and Transportation (AMT) Buildings are co-located to allow for shared linkages between programs, classrooms, and training spaces. The PSC features a 2,400 SF, three-story fire training tower, EMS Simulation Lab and Situation Rooms, Fire Training with “Class A” burn areas, and Fire Training Apparatus. The AMT houses […]
Piedmont High School Alan Harvey Theater
Construction of a new 22,700 SF theater complete with stage, 452 seats, drama classroom, green room, restrooms, conference room, and department offices. The new theater features a large, state-of-the-art auditorium with recessed tiered concrete seating structure, orchestra pits, acoustical paneling, modern A/V system, sound control booth, rigging, curtains, and smoke hatches. Sound-rated acoustical doors and […]
Oakland Unified School District Central Kitchen, Instructional Farm, and Education Center
New 45,000 SF centralized kitchen and food distribution facility that serves the entire Oakland Unified School District. The facility features 40,000 SF of kitchen space plus 5,000 SF of administration offices, classrooms, demonstration prep spaces, administrative support spaces, and 2 acres of farming site. A horticultural center and culinary learning center were also added. Construction […]
Piedmont High School and Middle School Renovations
Primary scope of work included renovations and seismic improvements for Piedmont High School’s Quad/Library (Building A) and Student Center (Building B). Building A included protection of existing historic type finishes, demolition and abatement, seismic improvements of new hand dug 12’-20’ deep foundations, concrete/shotcrete walls to roof structure for seismic reinforcing, a new roof plywood and […]
Tamalpais High School
Construction and modernization of an existing high school campus. Overaa removed the existing pools and constructed a new swimming pool with a mechanical building. A new site glass elevator tower for accessibility on the mountainous site, a weight room and field house buildings, tennis courts, a basketball court, parking lot, and a student drop off […]
Havens Elementary School – Ellen Driscoll Playhouse
Complete seismic upgrade and interior remodel of an existing playhouse. Scope included the protection of existing historic finishes, additional structural wood framing and concrete foundation for seismic improvements, new roof and fire sprinkler system, and a complete overhaul of interior finishes. We self-performed the extensive wood framing improvements, which was key to making the schedule […]
Hillview Middle School Menlo Park
88,000 SF new school construction at an occupied campus. The project included a library, state-of-the-art performing arts space, administration building, classrooms, covered walkways, gymnasium, commercial kitchen, and solar panel system. Classrooms are designed to support collaborative learning in all disciplines: science, industrial technology, computer, music, choir, and broadcast studio. The second phase was demolition of […]
Edna Maguire New Elementary School
Two phase project that included demolition of the existing elementary campus and construction of the new elementary school. Phase 1 included the set up of portables for interim housing and demolition of existing campus, plus site utility work during an intense 120 day schedule. Student safety was paramount in the planning and construction of the […]