Orinda Intermediate School Student Services Building

The phased lease-leaseback project includes the demolition the of the existing 10’s wing and preconstruction and construction services for the new 6,395 SF Student Services Building in its place. The Student Services Building will house administration, counselors, and a wellness center. The scope of work also includes the construction of a covered walkway, and sitework […]
Las Positas College Public Safety Complex & Advanced Manufacturing Transportation Facility

New LEED Silver buildings to provide modern career technology facilities and support spaces for the Fire Technology, Administration of Justice, Emergency Medical Service, Auto Technology and Welding programs at the college. The Public Safety Complex (PSC) and Advanced Manufacturing and Transportation (AMT) buildings are co-located to allow for shared linkages between programs, classrooms and event […]
Piedmont High School Alan Harvey Theater

Construction of a new 22,700 SF theater complete with stage, 452 seats, drama classroom, green room, restrooms, conference room, and department offices. The new theater features a large, state-of-the-art auditorium with recessed tiered concrete seating structure, orchestra pits, acoustical paneling, modern A/V system, sound control booth, rigging, curtains, and smoke hatches. Sound-rated acoustical doors and […]
Oakland Unified School District Central Kitchen, Instructional Farm, and Education Center

New 45,000 SF centralized kitchen and food distribution facility that serves the entire Oakland Unified School District. The facility features 40,000 SF of kitchen space plus 5,000 SF of administration offices, classrooms, demonstration prep spaces, administrative support spaces, and 2 acres of farming site. A horticultural center and culinary learning center were also added. Construction […]
Piedmont High School and Middle School Renovations

Primary scope of work included renovations and seismic improvements for Piedmont High School’s Quad/Library (Building A) and Student Center (Building B). Building A included protection of existing historic type finishes, demolition and abatement, seismic improvements of new hand dug 12’-20’ deep foundations, concrete/shotcrete walls to roof structure for seismic reinforcing, a new roof plywood and […]
Havens Elementary School – Ellen Driscoll Playhouse

Complete seismic upgrade and interior remodel of an existing playhouse. Scope included the protection of existing historic finishes, additional structural wood framing and concrete foundation for seismic improvements, new roof and fire sprinkler system, and a complete overhaul of interior finishes. We self-performed the extensive wood framing improvements, which was key to making the schedule […]
Tamalpais High School

Construction and modernization of an existing high school campus. Overaa removed the existing pools and constructed a new swimming pool with a mechanical building. A new site glass elevator tower for accessibility on the mountainous site, a weight room and field house buildings, tennis courts, a basketball court, parking lot, and a student drop off […]
Hillview Middle School Menlo Park

Occupied campus project, construction of a modern new school plus renovation/addition to one existing building. 88,000 SF of new construction covered six new, two-story buildings. This included: a library, state-of-the-art performing arts space, administration building, classrooms, covered walkways, gymnasium, commercial kitchen, and solar panel system. Classrooms are designed to support collaborative learning in all studies: […]
Edna Maguire New Elementary School

Two phase project that included demolition of the existing elementary campus and construction of the new elementary school. Phase 1 included the set up of portables for interim housing and demolition of existing campus, plus site utility work during an intense 120 day schedule. Student safety was paramount in the planning and construction of the […]
Monta Vista High School New Student Center & Quad Modernization

New 44,200 SF two-story student center plus renovation, reconfiguration, and reconstruction of the student quad and front drop-off area. The new student center features a college-style cafeteria and kitchen equipped with several stove tops, exhaust hoods, refrigerators, and monitor screens to display menus. The facility also houses programming and physics labs, restrooms, an electrical room, […]