Kennedy High School Modernization

Currently in preconstruction, this lease-leaseback project covers the transformation of the entire Kennedy High School campus in Richmond, CA. Phase 1 includes demolition of the existing Classroom/Administration Building and the Arts & Crafts/Health Building and construction of the New Classroom/Administration (including Health and Wellness Clinic) and Student Center, as well as site work. Phase 2 […]

Roosevelt Middle School Modernization

Preconstruction and construction services for the modernization of the main classroom building and structural upgrade to the theater to meet current safety guidelines, as well as general improvements to the learning spaces throughout the building. Scope also includes Interim Housing fit out and site utilities, as well as site prep work for the permanent Modular […]

Hayward High School Modernization

The phased project consists of preconstruction and construction services for the renovation and modernization to the occupied Hayward High School campus. Phase 1 was the renovations to the gymnasium. Phase 2 included interim housing, gym bleachers, and seismic strengthening. Phase 3 was the modernization of various buildings on the campus and HVAC upgrades.

Orinda Intermediate School Student Services Building

Preconstruction and construction services for the  new Student Services Building which houses the administration, counselors, and a wellness center. Scope also included the construction of four pre-checked covered walkways and sitework improvements.

Las Positas College Public Safety Complex & Advanced Manufacturing Transportation Facility

Preconstruction and construction services for the new Public Safety Complex (PSC) and Advanced Manufacturing and Transportation (AMT) Buildings, which are co-located to allow for shared linkages between programs, classrooms, and training spaces. The PSC features a 2,400 SF, three-story fire training tower, EMS Simulation Lab and Situation Rooms, Fire Training with “Class A” burn areas, […]

Piedmont High School Alan Harvey Theater

This phased, occupied campus project included preconstruction and construction services for the new new 22,700 SF theater complete with stage, 452 seats, drama classroom, green room, restrooms, conference room, and department offices.  The new theater features a large, state-of-the-art auditorium with recessed tiered concrete seating structure, orchestra pits, acoustical paneling, modern A/V system, sound control […]

Oakland Unified School District Central Kitchen, Instructional Farm, and Education Center

Preconstruction and construction services for the new, 43,000 SF, single-story, centralized kitchen and food distribution facility for the entire Oakland Unified School District. The facility includes 40,000 SF of kitchen space with 450 different kitchen equipment items and 20+ building operational systems; 5,000 SF of administration offices, classrooms, demonstration prep spaces, administrative support spaces; and […]

Piedmont High School and Middle School Renovations

Primary scope of work included renovations and seismic improvements for Piedmont High School’s Quad/Library (Building A) and Student Center (Building B). Building A included protection of existing historic type finishes, demolition and abatement, seismic improvements of new hand dug 12’-20’ deep foundations, concrete/shotcrete walls to roof structure for seismic reinforcing, a new roof plywood and […]

Tamalpais High School

Construction and modernization of an existing high school campus. Overaa removed the existing pools and constructed a new swimming pool with a mechanical building. A new site glass elevator tower for accessibility on the mountainous site, a weight room and field house buildings, tennis courts, a basketball court, parking lot, and a student drop off […]

Havens Elementary School – Ellen Driscoll Playhouse

Complete seismic upgrade and interior remodel of an existing playhouse. Scope included the protection of existing historic finishes, additional structural wood framing and concrete foundation for seismic improvements, new roof and fire sprinkler system, and a complete overhaul of interior finishes. We self-performed the extensive wood framing improvements, which was key to making the schedule […]