Havens Elementary School – Ellen Driscoll Playhouse

Complete seismic upgrade and interior remodel of an existing playhouse. Scope included the protection of existing historic finishes, additional structural wood framing and concrete foundation for seismic improvements, new roof and fire sprinkler system, and a complete overhaul of interior finishes. We self-performed the extensive wood framing improvements, which was key to making the schedule […]
Hillview Middle School Menlo Park

88,000 SF new school construction at an occupied campus. The project included a library, state-of-the-art performing arts space, administration building, classrooms, covered walkways, gymnasium, commercial kitchen, and solar panel system. Classrooms are designed to support collaborative learning in all disciplines: science, industrial technology, computer, music, choir, and broadcast studio. The second phase was demolition of […]
Edna Maguire New Elementary School

Two phase project that included demolition of the existing elementary campus and construction of the new elementary school. Phase 1 included the set up of portables for interim housing and demolition of existing campus, plus site utility work during an intense 120 day schedule. Student safety was paramount in the planning and construction of the […]
Monta Vista High School New Student Center & Quad Modernization

New 44,200 SF two-story student center plus renovation, reconfiguration, and reconstruction of the student quad and front drop-off area. The new student center features a college-style cafeteria and kitchen equipped with several stove tops, exhaust hoods, refrigerators, and monitor screens to display menus. The facility also houses programming and physics labs, restrooms, an electrical room, […]
John Swett High School, Phase I & II

New Administrative/Classroom Building and Arts Department, plus additions and modernization of an occupied campus. Phase I included modifications and additions to the existing buildings. Extensive interior renovations included: doors; windows; glazing; curtain walls; cabinets; acoustical tile and gypsum board ceilings; bathrooms; finishes including flooring, painting, ceramic tile, other wall coverings and wall base; and replacement […]
Sankofa Academy, Washington Elementary School, Phase I & II

Modernization of a 42,340 SF elementary school building completed in two, eight week sessions over two summer breaks. Scope covered two-stories plus basement cafeteria. 14 classrooms, auditorium, library, warming kitchen, administrative and support spaces, plus a licensed kindergarten were renovated. Additional scope covered site work, electrical systems upgrade, fire alarm replacement, interior finishes and window […]
Evergreen Valley College Automotive Technology Building

Preconstruction and construction services for the new 39,250 SF high performance facility featuring thirty automobile bays, lecture rooms/classrooms, teacher offices, and an outdoor patio. The bays contain specialty equipment such as lifts, utilities, exhaust hoods, and upgraded mechanical systems. A tool room, engine machine shop, engine cleaning room, fuel and electrical lab, and smog testing […]
Scotts Valley Middle School

Preconstruction and construction services for the modernization of three classroom wings and multi-purpose building, and extensive site work to accommodate utilities work and accessible path of travel throughout the site. Scope also included construction of new admin and library buildings, three classroom buildings, and gym.
De Anza College – Flint Parking Structure Seismic Repairs

DSA coordinated project involving the seismic upgrade and renovation of an existing 500,000 SF parking structure on an occupied college campus. We removed portions of the existing foundations and added enlarged foundations, shear walls and tie-beams to the four-level, 1,800 stall facility. Scope also covered additional upgrades to the exterior and interior of the structure […]
Lynbrook High School Field House

Addition of a new 9,000 SF physical education and dance studio, plus renovations on the occupied campus. The new Field House contains a physical education classroom, weight and cardio room, dance and fitness room and additional support spaces. Renovations included a complete interior renovation of the restrooms, and installation of a new roof and exterior […]