Located on Highway 4, west of the Bailey Road interchange. The station Includes a pedestrian bridge, which spans an active freeway. The bridge sits on twin-pier pedestals over the freeway median and links the parking area to the station.
Overaa constructed the station with 1.5 million pounds of structural steel using weekend and night-time crews. All elements were set without error. Overaa field checked all anchor bolts and survey points.

Project included:

  • Bus Shelter, Station Entrance Building, Pedestrian Overpass, Station Concourse, and associated Station Appurtenances
  • Kiosk, Transportation Building, 2000 car parking lot and driveways, Train Yard, and all other transit facility systems
  • Work included permanent fences and gates, temporary fences and barricades, site preparation, and traffic control
  • All systems to support the BART station were installed (sanitary sewage, site drainange, utililty structure, MEP systems, etc.)
Owner
BART
Location
Pittsburg, CA
  • Ben Brown

    Ben Brown

    Project Director

  • When I first met Jerry in 2002 as the newly arrived CM Department Head at Cal Poly, I remember leaving the meeting and saying to my colleague, ‘There is a true construction professional.’  Since that time, Jerry has continued to be the most direct, most supportive, and most trusted advisor with whom I have worked.  His generous financial support has helped make the new Construction Management Building at Cal Poly a reality and that support will be recognized through the naming of the “Overaa and Watry Fundamentals of Construction Management Lab”.  We look forward to many more years of partnership between Jerry and Cal Poly.

    Al Hauck

    Former Department Head, CM Department, Cal Poly San Luis Obispo