Ohlone Community College District Parking Structure

New cast-in-place parking structure on a occupied college campus. Scope covered demolition and construction of a new five-level, 300,000 SF parking facility complete with 905 stalls, plus a pedestrian sidewalk and turnaround that connects the structure to the campus. The project contributes to the campus’ sustainability goals including net-zero energy consumption. Self-performed work included general […]
LBNL FLEXLAB

Construction of one of the most advanced and heavily-instrumented facilities in the United States for developing and validating low energy integrated building systems. The net zero “Facility for Low-Energy Experiments in Building” or FLEXLAB featured construction of the world’s first rotating test bed. The “lazy-susan” building tracks the sun from the southeast to the northeast, […]
Kaiser Permanente Parking Structure, San Rafael

Partial demolition, expansion, and seismic upgrade of an existing parking structure. The new 117,600 SF addition is a pre-cast, four-level, hybrid structure that incorporated precast beams and columns, as well as cast-in-place upturned beams and post tension decks. It was designed so that the new and old structure were tied together by the foundation while […]
Stranda Apartments

New 4-level, mixed retail and apartment building in downtown Berkeley. Property features ground level retail space, 21 apartments, rooftop communal space, and below ground elevated lift garage.
John Swett High School, Phase I & II

New Administrative/Classroom Building and Arts Department, plus additions and modernization of an occupied campus. Phase I included modifications and additions to the existing buildings. Extensive interior renovations included: doors; windows; glazing; curtain walls; cabinets; acoustical tile and gypsum board ceilings; bathrooms; finishes including flooring, painting, ceramic tile, other wall coverings and wall base; and replacement […]
Sankofa Academy, Washington Elementary School, Phase I & II

Modernization of a 42,340 SF elementary school building completed in two, eight week sessions over two summer breaks. Scope covered two-stories plus basement cafeteria. 14 classrooms, auditorium, library, warming kitchen, administrative and support spaces, plus a licensed kindergarten were renovated. Additional scope covered site work, electrical systems upgrade, fire alarm replacement, interior finishes and window […]
Aragon High School Theater

Architecturally challenging 20-month theater project. The new theater building is a three-story steel structure over a partial concrete basement with additional catwalk levels. The 23,000 SF facility features a 615-seat modern theatre with theatrical fly loft, state-of-the-art theatrical lighting and sound systems, orchestra pit, and sound reflectors. It also contains classrooms, offices, equipment bay and […]
Evergreen Valley College Automotive Technology Building

Preconstruction and construction services for the new 39,250 SF high performance facility featuring thirty automobile bays, lecture rooms/classrooms, teacher offices, and an outdoor patio. The bays contain specialty equipment such as lifts, utilities, exhaust hoods, and upgraded mechanical systems. A tool room, engine machine shop, engine cleaning room, fuel and electrical lab, and smog testing […]
Albany Public Works Service Center

Design and construction of two structures on an approximately one-acre site. The main two-story building is a 16,000 SF pre-engineered steel structure with metal siding and an elevated concrete deck. The first floor is designated for the fleet program and features a warehouse and various shops. The second floor consists of office space that features […]
Edna Maguire New Elementary School

Two phase project that included demolition of the existing elementary campus and construction of the new elementary school. Phase 1 included the set up of portables for interim housing and demolition of existing campus, plus site utility work during an intense 120 day schedule. Student safety was paramount in the planning and construction of the […]