University of California, San Francisco – Mission Bay Building 23B Parking Structure

Design and construction of a 256,276 SF pre-cast hybrid parking structure in Mission Bay, a very congested area of San Francisco. The facility includes 882 parking stalls on nine-levels with two elevators. The exterior features DNA bar-code style custom glass cladding. Overaa self-performed the vertical poured-in place concrete and foundations. The project was awarded Excellence […]

Oakland Unified School District Central Kitchen, Instructional Farm, and Education Center

Preconstruction and construction services for the new, 43,000 SF, single-story, centralized kitchen and food distribution facility for the entire Oakland Unified School District. The facility includes 40,000 SF of kitchen space with 450 different kitchen equipment items and 20+ building operational systems; 5,000 SF of administration offices, classrooms, demonstration prep spaces, administrative support spaces; and […]

Columbia Park Manor

Construction of a 62,000 SF affordable housing complex for seniors. The two-story, wood frame and structural steel building contains 80 units. Community involvement was an important priority – Overaa met all MBE/WBE/Local project requirement goals. The project was located in a congested residential urban area with adjacent occupied buildings.

University of California, Berkeley – Durant Student Apartments

Design and construction of a four-story student housing complex on a very tight urban site. The structure is immediately adjacent to the Hayward Fault and was designed to exceed the seismic standards of the current building codes. Building exteriors include architectural features that provide an attractive enhancement to the surrounding historic hillside district. Carefully constructed […]

Piedmont High School and Middle School Renovations

Primary scope of work included renovations and seismic improvements for Piedmont High School’s Quad/Library (Building A) and Student Center (Building B). Building A included protection of existing historic type finishes, demolition and abatement, seismic improvements of new hand dug 12’-20’ deep foundations, concrete/shotcrete walls to roof structure for seismic reinforcing, a new roof plywood and […]

Kaiser Vallejo Parking Structure

Construction of a 241,750 SF parking structure with 3,500 SF of office space on the ground floor. The four-level facility was built was in operating hospital site – extensive coordination was required to mitigate impacts of construction on the adjacent occupied facilities. We assisted the Owner in making critical design decisions based on construction costs. […]

Richmond City Hall

Design-build renovation and rehabilitation of a 70,000 SF steel-framed city hall and adjacent former police department into a new, seismically upgraded LEED Gold Essential Services Facility (ESF). Steel bracing and concrete shear walls were added, new exterior stone cladding was installed; existing historic brick cladding and MEP systems and interiors were restored; existing historic building […]

Genentech Parking Structures

Design and construction of two cast-in-place parking structures to accommodate biotech’s South San Francisco campus growth. Parking Structure I is a 165,000 SF, five-level, 489 stall facility. Parking Structure II is a 199,767 SF , seven-level, 640 stall facility. Combined, Overaa placed 14,900 CY of concrete on the projects.

Tamalpais High School

Construction and modernization of an existing high school campus. Overaa removed the existing pools and constructed a new swimming pool with a mechanical building. A new site glass elevator tower for accessibility on the mountainous site, a weight room and field house buildings, tennis courts, a basketball court, parking lot, and a student drop off […]

Las Positas College Center for the Performing Arts

New three-story LEED Silver facility with a 500 seat main theater designed by renowned designer of performing arts theater projects, John Sergio Fisher. Scope included a 150 seat black box theater and a 1,500 seat outdoor below grade amphitheater. The main audience chamber/stage is complete with a tension grid, catwalks, and grid iron deck. The […]