Kaiser Oakland Medical Office Building Parking Structure #1

Design and construction of a 238,800 SF cast-in-place parking structure connected to a Medical Office Building (MOB), which was constructed simultaneously by another general contractor. Careful coordination of the parking structure façade with the adjacent medical office building was critical. The six-level (two below grade), 531 stall parking structure included a 3″-6″ thick mat slab […]

Santana Row Parcel 3B Parking Structure Expansion

Design and construction of a major addition to an existing, operational three-level garage at a mixed use property. The 290,000 SF cast-in-place parking structure expansion provides an additional 860 stalls and increases the total structure to 713,500 SF. The project was located in a dense residential and commercial district on a major thoroughfare. Overaa scheduled […]

University of California, Berkeley – Underhill Parking & Athletic Field

Design and construction of a 380,000 SF pre-cast hybrid parking facility featuring a roof-level recreation field. The structure fits in seamlessly with and acts as a social hub for the adjacent student housing and private apartments. The four parking levels are either partially or completely below grade. As the site slopes downward, the facility emerges […]

Alameda Historic Theatre Restoration & Civic Center Parking Garage

The theatre first opened in 1932 and was originally designed by Timothy Pflueger, a prominent architect whose work includes the historic Paramount Theatre and Pacific Stock Exchange buildings in San Francisco. By 1979, the Alameda Theatre, located in Downtown Alameda, closed its curtain as a result of declining attendance. Over the years, it housed a […]

Alameda Civic Center Parking Structure

Design and construction of a six-level, 350 stall parking garage. The new facility features two elevators, two stair towers, and an exterior skin comprised of plaster/metal/concrete/foam shapes/CMU. It is adjacent to a historic theatre built in 1932 that Overaa restored, as well as a new cineplex.

Pleasant Hill BART Garage Expansion

Design and construction of a cast-in-place expansion to an existing parking structure. In addition to developing a design that addressed massing sensitivities to the adjacent residential areas, Overaa developed a two-phased approach that allowed the public to park in the existing structure during construction. The new 525,500 SF, nine-level (1-below grade) parking structure includes three […]

Westlake Shopping Center Parking Structure

Design and construction of 204,670 SF cast-in-place parking structure in a congested retail site surrounded by a residential community. We held regularly scheduled site planning meetings with the owner to ensure pedestrian access to all retail destination points during construction of the six-level, 640 stall facility. Overaa self-performed structural excavation, layout, foundations, slab-on-grade, and vertical […]

Kaiser South Sacramento Parking Structure

Design and construction of a 285,000 SF precast hybrid parking structure built on a fully operational hospital campus. The five-level, 886-stall facility features an architectural façade composed of multiple materials. The structural skeleton is pre-cast column and beams with cast-in-place decks. Structural skeleton was installed in one mobilization, each piece flown in via crane. Overaa […]

University of California, Berkeley – Surge Building

UC Berkeley’s Field Annex Project, known as the Surge Building, is a four building complex on campus. It serves as the temporary home for Cal’s Pacific Film Archives Theatre. The project includes classrooms, lecture rooms, breakrooms and an auditorium. The design-build project used innovative pre-engineered metal building material to keep the project cost down and […]

Army Reserve Regional Readiness Sustainment Command Headquarters

Design and construction of three buildings – Armed Reserve Center, Army Reserve Regional Readiness Sustainment Command Headquarters, and Fitness Center – totaling 279,000 SF across a 30-acre site.  The LEED Silver buildings provide administrative, meeting, training, and equipment spaces. Scope included a new gymnasium and 225-seat theater. Our design-build team self-performed all the structural concrete […]