Sobrante & Upper San Leandro Water Treatment Plants Ozone Improvements

Improvements to the ozonization and oxygenation processes at two water treatment plants. Scope included replacing the ozone systems (generators, power supply units, and ozone destruction systems), hydrogen peroxide system and associated piping. Installation of a new Liquid Oxygen (LOX) system, a supplemental Nitrogen System, a new emergency generator and fuel tank also provided. Extensive electrical […]

La Clinica Medical Office Building Expansion

Expansion transforming a retail space into a 26,000 SF state-of-the-art medical facility. Major tenant improvements were required. This included demolition and abatement, new MEP and fire sprinkler systems, structural systems and seismic upgrades, new interior and exterior improvements, roofing, and site work. Seismic upgrades involved the installation of tie-backs and full structural underpinning of existing […]

Family Practice Clinic, Pittsburg

Interior renovation and expansion of an outpatient primary care clinic. Precautions were taken due to the second-floor location and required coordination with the adjacent clinics to avoid any disruption. Construction included additional exam rooms, restrooms, break room, an expanded waiting room area, and associated support spaces. Scope also covered the demolition of existing interior walls, […]

Carquinez Middle School

Preconstruction and construction services for the replacement campus project on the same site as the fully active middle school campus. The new school includes a 47,181 SF, three-story building featuring cafeteria and kitchen, admin offices, library, 15 classrooms, and gym with auditorium. Scope also included associated site work plus demolition of the existing buildings with […]

Beach Park Elementary School

Construction of the new 36,500 SF elementary school that accommodates approximately 425 K-5 students. To encourage working together and hands-on learning, the classrooms are clustered with shared indoor and outdoor collaboration areas. The Library/Media Center is flexibly designed with small group instructional rooms, learning nooks for instruction, and quiet space for reading and conversation. The […]

Santa Rosa Memorial Parking Structure

Design and construction of a 216,380 SF post tensioned, cast-in-place concrete parking structure on an occupied hospital campus. The new six-level, 604-stall facility was built simultaneously with the new adjacent Medical Office Building (MOB), which was constructed by another general contractor (GC). Careful coordination with the other GC on concrete pour schedules, traffic, pedestrian access/right-of-ways, […]

Fremont Bank Headquarters

A Silicon Valley Business Journal Structures award winner for Best Office Building (small category), this six-story, steel frame structure serves as the new headquarters for one of California’s oldest, independent, family-owned and managed banks. Located in Fremont’s downtown, this project revitalizes the commercial district. The building features a roof top gathering place, all-glass frontage doors, […]

Stanislaus Regional Water Authority Water Treatment Plant

Design and construction of a 30 MGD surface water treatment facility to diversify the regional water supply, allow for drought water management, improve water quality, and help replenish ground water supplies. Scope included all structures within the treatment plant footprint, yard piping, and all the concrete work, as well as the process equipment installation. A […]

Confidential Refinery Client Maintenance & Shop Building

New 105,500 SF critical facility for a leading multinational energy corporation’s refinery. The high performance facility is a combination of pre-engineered metal building shell along with custom structural elements and foundation support systems. It features shop spaces and offices to accommodate the entire refinery’s fabrication, repair, and maintenance needs in-house. This includes 40,000 SF dedicated […]

Fresno Airport Terminal Parking Structure

Design and construction of a 4-story parking structure built directly across from the airport terminal. The parking structure has a footprint of 80,300 SF and is 318,000 gross square feet in total. The facility utilizes a new automated parking guidance system, which includes intuitive wayfinding and signage system, license plate recognition software, as well as […]