Kaiser Oakland Medical Center Parking Structure Phase 2

Design and construction of a 410,000 SF parking structure directly across from an operating Medical Office Building (MOB). The ten-level (two below grade), 1,220 stall facility is comprised of a pre-cast hybrid structural system. It features a mat slab foundation, waterproofed basement levels, metal panels, and perforated metal screening. Overaa self-performed the 7,000 cubic yard […]
Hillview Middle School Menlo Park

88,000 SF new school construction at an occupied campus. The project included a library, state-of-the-art performing arts space, administration building, classrooms, covered walkways, gymnasium, commercial kitchen, and solar panel system. Classrooms are designed to support collaborative learning in all disciplines: science, industrial technology, computer, music, choir, and broadcast studio. The second phase was demolition of […]
California Shakespeare (CalShakes) Theater

Construction of a LEED Gold designed theater building. Scope included demolition of seven existing site structures. We excavated the hillside at the site of the former café and dressing rooms to create space for the basement-level undercroft of the new building. The new facility houses the actors’ dressing rooms, green room, theater store, concessions, and […]
Atwater Bert Crane Wastewater Treatment Plant Improvements

Construction of a new 6 MGD treatment plant. The project included all wastewater treatment processes from headworks through UV disinfection. Solids management was handled through aerobic digesters and screw presses. New buildings include a 3,200 SF administration building containing a laboratory, electrical power, instrumentation, and facilities. Two pre-engineered metal buildings were also provided: a 2,400 […]
FedEx Aircraft Maintenance and Storage Tenant Improvements

Tenant improvements for a 19,000 SF existing package sorting facility located at Oakland International Airport. Scope included removal of the existing package sort equipment, plus the addition of office and storage space, and improvements to existing office spaces. During preconstruction, Overaa was notified of FedEx’s busiest days and holiday schedules requiring us to schedule deliveries […]
The Father’s House

Construction of a 30,000 SF concrete tilt up worship center, a 14,000 SF wood framed preschool and daycare, and a classrooms building. Scope also covered extensive site work across the 22 acre campus, including concrete water fountains, a large patio area, and 600+ parking stalls. A year of preconstruction efforts provided significant savings to the […]
Signature Flight Hangar

Construction of a 25,000 SF hangar supported by 2,600 SF of office space and meeting rooms, with a parking lot to accommodate 70 vehicles. Work performed within SFO secure areas required special badging and close coordination with SFO security. Overaa coordinated the locating and tie-ins of all underground utilities with multiple SFO authorities having jurisdiction. […]
Hazel Hawkins Women’s Center Mammogram Department Upgrades

Tenant improvement project involving rehabilitation work and upgrades to a mammogram department. Construction occurred on the second floor above an existing surgeries suite and a labor/delivery center. We carefully sequenced construction activities to minimize disruption to patients and staff. Scope covered demolition, structural and HVAC improvements, finish carpentry and cabinetry, and interior finishes.
Sufism Reoriented Sanctuary

Preconstruction and construction services for the 66,074 SF sanctuary designed by the renowned architectural firm of Philip Johnson/Alan Ritchie. The sacred design includes marble clad concrete domes surrounded by contemplative gardens. Smaller domes surround a larger central dome used as a Prayer Hall, which is bathed in natural light by a central oculus. Trim, installed […]
Saint Mary’s College Recreation Center & Swimming Pool

64,000 SF new recreation center which supports the College’s Division I athletic programs and is the centerpiece for its new athletic corridor. The main building includes three full size indoor courts for multiple sports, plus weight training and yoga room. Scope also covered a rock climbing wall, fitness rooms, men and women locker rooms, conference […]