Vietnam Town Parking Structure

Design and construction of a 167,000 SF cast-in-place parking structure for a multi-phase development spanning 6 acres. The four-level, 517 stall facility includes 65 short-term and 65 long-term bicycle spaces. We self-performed the vertical and horizontal formwork, as well as embeds and layout. Coordination with adjacent construction projects that the owner had underway at the […]

Napa Material Reuse Facility

Design and construction of the City of Napa’s Compost Facility improvements included a covered aerated static pile (CASP) drying system consisting of covered concrete bunkers with in-slab aeration piping to expedite the composting process. The project also included modifications to the facility’s existing stormwater management system through a series of earthen settling and filter ponds. The scope of work included […]

Davis-Woodland Water Supply Project

Design and construction of a regional 30 MGD water facility that largely replaces deteriorating groundwater supplies with safe, more reliable surface water supplies from the Sacramento River. Highlights of the new process facility includes sand ballasted clarifiers, deep bed filters, ozone disinfection, and a high service pump station that serves the cities of Woodland and […]

San Pablo City Hall

Design and construction of the LEED Silver City Hall to replace its existing facilities. The new building houses all City Hall operations including office and administration needs, with Council chambers for public meetings. Scope covered a commercial kitchen, community rooms, and sitework (earthwork, utilities, asphalt paved parking lots, site concrete and landscaping). Utilizing the cast […]

WETA Central Bay Operations and Maintenance Building

Complex design-build project with Overaa and another general contractor (GC) splitting scopes between land and water construction services. Overaa managed the design-build services for the 28,000 SF, four-story Central Bay Operations and Maintenance Facility (O&M) facility. The other GC managed the design-build services for the waterside work which included marine floats and piles, dredging, berthing […]

Underground Construction Office Addition

Design and construction of 20,000 SF concrete tilt-up office expansion. The foundations and slab-on-grade were completed in five months to use as casting bed for the panel formation of 15 panels. An additional casting bed was constructed for the remaining panels. All 20 panels were tilted in a day. Scope included improvements to the electrical, […]

Pacific Grove MBR Local Recycled Water Project

Design and construction of a 0.25 MGD MBR water recycling facility to produce 125 acre-feet per year of non-potable water supply for the City of Pacific Grove, CA irrigation use. Construction included a complete waste water treatment facility with headworks/influent screening, biological treatment with a suspended growth/activated sludge process, membrane separation, UV disinfection, chlorine addition, […]

College of Alameda New Center for Liberal Arts

Design and construction of the new Center for Liberals Arts at the occupied College of Alameda campus. The 53,000 SF facility features two specialized buildings joined by a central atrium. A two-story administration wing houses conference rooms, offices spaces, seminar rooms, and Dean’s offices. A three-story classroom building houses lecture rooms, apparel design/sewing/arts laboratories, gallery, […]

Michelle Obama Elementary School

Design and construction of a new 53,400 SF, K-6 elementary school campus with intentionally designed flexible spaces. A welcoming bioswale entry plaza provides a safe pickup and drop-off location and defines the most public and community-oriented zone of the school, with the community room and multipurpose room directly adjacent to it.  The parent room, community […]

West County Health Center Expansion

Design and construction of the 20,700 SF clinic expansion connected to an existing medical facility. The two-story, LEED Silver expansion provides over 50 patient care and therapy rooms for integrated mental health and substance abuse treatment. Scope also included a covered pedestrian walkway, shared outdoor courtyard, a new service yard, drop-off area, parking stalls, improved […]