Beth Sholom New Sanctuary and Social Hall

Construction of a 24,308 SF sanctuary and social hall comprised of two architecturally distinct buildings juxtaposed to form a courtyard gathering space. The first building is a cast-in-place concrete sanctuary bathed in light from the nearly 1,000 SF of skylights. Carefully formed to exacting dimensions, the two foot thick walls are made of poured in […]

Kaiser South Sacramento Parking Structure

Design and construction of a 285,000 SF precast hybrid parking structure built on a fully operational hospital campus. The five-level, 886-stall facility features an architectural façade composed of multiple materials. The structural skeleton is pre-cast column and beams with cast-in-place decks. Structural skeleton was installed in one mobilization, each piece flown in via crane. Overaa […]

Roseville Galleria Cliff Deck Parking

Design and construction of a 432,290 SF hybrid precast parking structure. The new five-level facility was engineered to accommodate a future sixth-level and includes a bridge connector to the adjacent mall. The 1,382 stall structure features different colored architectural pre-cast concrete panels, as well as architectural wire mesh and green screen systems. Overaa completed this […]

Catholic Healthcare West Sequoia Hospital Parking Garage

Design and construction of a 231,000 SF cast-in-place garage adjacent to a concurrent hospital expansion. The five-level, 670 stall facility features a compressed pallet of materials and colors for an overall architecture consistent with the existing hospital campus and adjacent residential properties. A combination of perforated precast panels and a stainless steel screen limit light […]

Mission Bay Block 27 Parking Structure

Design and construction of a 469,700 SF cast-in-place parking structure that serves adjacent laboratories and offices located within San Francisco’s Mission Bay redevelopment zone. The 1,423 stall, seven-level structure was built as part of a biotech development – extensive coordination with other project teams on the surrounding parcels was required as it was constructed concurrently […]

Kaiser Oakland Medical Office Building Parking Structure #1

Design and construction of a 238,800 SF cast-in-place parking structure connected to a Medical Office Building (MOB), which was constructed simultaneously by another general contractor. Careful coordination of the parking structure façade with the adjacent medical office building was critical. The six-level (two below grade), 531 stall parking structure included a 3″-6″ thick mat slab […]

Santana Row Parcel 3B Parking Structure Expansion

Design and construction of a major addition to an existing, operational three-level garage at a mixed use property. The 290,000 SF cast-in-place parking structure expansion provides an additional 860 stalls and increases the total structure to 713,500 SF. The project was located in a dense residential and commercial district on a major thoroughfare. Overaa scheduled […]

Moraga Country Club

Construction of a 20,000 SF wood frame facility featuring dining facilities, gathering open areas, and a men’s and women’s locker rooms. During the preconstruction phase, we worked closely with the architect and committee members to provide value options and ongoing constructability reviews to help the club meet its budget goals.

Livermore Civic Center Library

New one story, 52,300 SF library project included extensive site work and landscaping. The interior features exposed structural steel alongside custom woodwork. Scope covered staff areas (14,800 SF), reading areas (over 16,000 SF), book stacking (15,000 SF), story time area, conference and card rooms, two kitchens, and other public areas (6,300 SF). The project included […]

University of California, Berkeley – Surge Building

UC Berkeley’s Field Annex Project, known as the Surge Building, is a four building complex on campus. It serves as the temporary home for Cal’s Pacific Film Archives Theatre. The project includes classrooms, lecture rooms, breakrooms and an auditorium. The design-build project used innovative pre-engineered metal building material to keep the project cost down and […]