Mission Bay Block 27 Parking Structure

Design and construction of a 469,700 SF cast-in-place parking structure that serves adjacent laboratories and offices located within San Francisco’s Mission Bay redevelopment zone. The 1,423 stall, seven-level structure was built as part of a biotech development – extensive coordination with other project teams on the surrounding parcels was required as it was constructed concurrently […]

Kaiser Oakland Medical Office Building Parking Structure #1

Design and construction of a 238,800 SF cast-in-place parking structure connected to a Medical Office Building (MOB), which was constructed simultaneously by another general contractor. Careful coordination of the parking structure façade with the adjacent medical office building was critical. The six-level (two below grade), 531 stall parking structure included a 3″-6″ thick mat slab […]

Santana Row Parcel 3B Parking Structure Expansion

Design and construction of a major addition to an existing, operational three-level garage at a mixed use property. The 290,000 SF cast-in-place parking structure expansion provides an additional 860 stalls and increases the total structure to 713,500 SF. The project was located in a dense residential and commercial district on a major thoroughfare. Overaa scheduled […]

Moraga Country Club

Construction of a 20,000 SF wood frame facility featuring dining facilities, gathering open areas, and a men’s and women’s locker rooms. During the preconstruction phase, we worked closely with the architect and committee members to provide value options and ongoing constructability reviews to help the club meet its budget goals.

Livermore Civic Center Library

New one story, 52,300 SF library project included extensive site work and landscaping. The interior features exposed structural steel alongside custom woodwork. Scope covered staff areas (14,800 SF), reading areas (over 16,000 SF), book stacking (15,000 SF), story time area, conference and card rooms, two kitchens, and other public areas (6,300 SF). The project included […]

University of California, Berkeley – Surge Building

UC Berkeley’s Field Annex Project, known as the Surge Building, is a four building complex on campus. It serves as the temporary home for Cal’s Pacific Film Archives Theatre. The project includes classrooms, lecture rooms, breakrooms and an auditorium. The design-build project used innovative pre-engineered metal building material to keep the project cost down and […]

USPS Process & Distribution Center Expansion and Renovation

Construction of 135,000 SF tilt-up concrete and masonry addition complete with all major building systems, paving and landscaping, plus the relocation and construction of a new Bulk Mail Entry Unit building. Scope also covered renovations and alterations to numerous areas throughout the 200,000 SF existing facility. The large expansion to existing USPS facility includes space […]

Army Reserve Regional Readiness Sustainment Command Headquarters

Design and construction of three buildings – Armed Reserve Center, Army Reserve Regional Readiness Sustainment Command Headquarters, and Fitness Center – totaling 279,000 SF across a 30-acre site.  The LEED Silver buildings provide administrative, meeting, training, and equipment spaces. Scope included a new gymnasium and 225-seat theater. Our design-build team self-performed all the structural concrete […]

LBNL Advanced Light Source User Support Building

Design and construction of a LEED Gold facility that supports LBNL’s Advance Light Source (ALS) Building, which houses a specialized particle accelerator that generates bright beams of x-ray light for scientific research. The new 31,000 SF facility contains staging for experiments, labs, storage spaces, conference rooms and offices. Construction is slab-on-grade, light/heavy gauge metal framing […]

Stanford Linear Accelerator Research Building 52

Design and construction of a 64,000 SF, LEED Gold office building that houses Stanford’s control room for the multiple accelerators on its campus. The structural design for the new building was based on a sustainable, integrated systems approach. Construction included a unique rain screen system that utilizes a Norwegian weatherproof material. The outside wall was […]