Army Reserve Center Concord

Design and construction of a new 64,000 SF Army Reserve Center (ARC), 9,500 SF Organizational Maintenance Shop (OMS), and 4,000 SF unheated storage building. The project is LEED Gold certified and features a 87,000 SF photovoltaic field that generates about 465 kilowatts of electricity directly tied into the new training and storage building’s electrical system. […]
University of California, Berkeley – Greek Theater Seismic Upgrade

Life-safety and accessibility upgrades plus seismic retrofit of historic theater located near the Hayward fault line. The challenge was to design and complete the renovation while preserving the historic fabric of the 100+ year old building, all within a condensed project schedule. All retrofit work was done below ground or within the voids of the […]
San Francisco State University – Parking Lot 20 Seismic Repairs

Seismic repairs and access modifications to a five-level, 800-stall garage within a five month accelerated schedule. Scope included new shear walls, crack repair, the addition of fortifying steel plates, a new elevator, and a new pedestrian bridge. The parking structure was kept operational throughout construction. We developed a detailed phasing plan, by floor and by […]
Oakland Airport Aircraft Rescue and Fire Fighting Facility

Construction of a 9,000 SF single-story CMU structural steel fire station and office building, and a 26,000 SF cast-in-place concrete/metal joist apparatus bay. An In-Transit-Lounge with pedestrian bridge was also provided. Scope covered all finishes, site concrete, site utilities, site work, specialty areas, paved parking area, vehicle wash area and fuel station, specialty equipment, concrete […]
AC Transit Bus Yard, Maintenance Shop & Office

Design and construction of a new 172 bus operating division. The site remained functional throughout construction. The new division features a fueling facility, underground tank farm, bus washer, bus maintenance areas, storage areas, offices, driver dispatch and waiting areas, and employee parking. Scope also covered the demolition of existing structures and removal of underground tanks, […]
VA Palo Alto Mental Health Training Facility & Rose Garden

Construction of a 14,500 SF structural steel medical training facility complete with auditoriums, class rooms and open office areas. The LEED Silver, two-story building is clad in cementitious and aluminum panels along with glazed curtain walls and aluminum fin break shapes. Construction included two new elevators and full IT/voice/data/security/audio and visual systems. Interior finishes included […]
VA Mather Behavioral Health Inpatient Unit

Design and construction of a 14,127 SF behavioral health inpatient unit on an occupied Air Force Base. The LEED Silver facility includes a combination of secure single and double secure patient rooms, as well as administrative, support, and service areas. Project site improvements included parking lots, sidewalks, landscaping and security features. The foundation and roof deck […]
Kaiser Oakland Medical Center Parking Structure Phase 2

Design and construction of a 410,000 SF parking structure directly across from an operating Medical Office Building (MOB). The ten-level (two below grade), 1,220 stall facility is comprised of a pre-cast hybrid structural system. It features a mat slab foundation, waterproofed basement levels, metal panels, and perforated metal screening. Overaa self-performed the 7,000 cubic yard […]
Hillview Middle School Menlo Park

88,000 SF new school construction at an occupied campus. The project included a library, state-of-the-art performing arts space, administration building, classrooms, covered walkways, gymnasium, commercial kitchen, and solar panel system. Classrooms are designed to support collaborative learning in all disciplines: science, industrial technology, computer, music, choir, and broadcast studio. The second phase was demolition of […]
California Shakespeare (CalShakes) Theater

Construction of a LEED Gold designed theater building. Scope included demolition of seven existing site structures. We excavated the hillside at the site of the former café and dressing rooms to create space for the basement-level undercroft of the new building. The new facility houses the actors’ dressing rooms, green room, theater store, concessions, and […]