Mission Bay Block 27 Parking Structure

Design and construction of a 469,700 SF cast-in-place parking structure that serves adjacent laboratories and offices located within San Francisco’s Mission Bay redevelopment zone. The 1,423 stall, seven-level structure was built as part of a biotech development – extensive coordination with other project teams on the surrounding parcels was required as it was constructed concurrently […]
Kaiser Oakland Medical Office Building Parking Structure #1

Design and construction of a 238,800 SF cast-in-place parking structure connected to a Medical Office Building (MOB), which was constructed simultaneously by another general contractor. Careful coordination of the parking structure façade with the adjacent medical office building was critical. The six-level (two below grade), 531 stall parking structure included a 3″-6″ thick mat slab […]
Moraga Country Club

Construction of a 20,000 SF wood frame facility featuring dining facilities, gathering open areas, and a men’s and women’s locker rooms. During the preconstruction phase, we worked closely with the architect and committee members to provide value options and ongoing constructability reviews to help the club meet its budget goals.
University of California, Berkeley – Surge Building

UC Berkeley’s Field Annex Project, known as the Surge Building, is a four building complex on campus. It serves as the temporary home for Cal’s Pacific Film Archives Theatre. The project includes classrooms, lecture rooms, breakrooms and an auditorium. The design-build project used innovative pre-engineered metal building material to keep the project cost down and […]
Army Reserve Regional Readiness Sustainment Command Headquarters

Design and construction of three buildings – Armed Reserve Center, Army Reserve Regional Readiness Sustainment Command Headquarters, and Fitness Center – totaling 279,000 SF across a 30-acre site. The LEED Silver buildings provide administrative, meeting, training, and equipment spaces. Scope included a new gymnasium and 225-seat theater. Our design-build team self-performed all the structural concrete […]
LBNL Advanced Light Source User Support Building

Design and construction of a LEED Gold facility that supports LBNL’s Advance Light Source (ALS) Building, which houses a specialized particle accelerator that generates bright beams of x-ray light for scientific research. The new 31,000 SF facility contains staging for experiments, labs, storage spaces, conference rooms and offices. Construction is slab-on-grade, light/heavy gauge metal framing […]
Stanford Linear Accelerator Research Building 52

Design and construction of a 64,000 SF, LEED Gold office building that houses Stanford’s control room for the multiple accelerators on its campus. The structural design for the new building was based on a sustainable, integrated systems approach. Construction included a unique rain screen system that utilizes a Norwegian weatherproof material. The outside wall was […]
Army Reserve Center Concord

Design and construction of a new 64,000 SF Army Reserve Center (ARC), 9,500 SF Organizational Maintenance Shop (OMS), and 4,000 SF unheated storage building. The project is LEED Gold certified and features a 87,000 SF photovoltaic field that generates about 465 kilowatts of electricity directly tied into the new training and storage building’s electrical system. […]
AC Transit Bus Yard, Maintenance Shop & Office

Design and construction of a new 172 bus operating division. The site remained functional throughout construction. The new division features a fueling facility, underground tank farm, bus washer, bus maintenance areas, storage areas, offices, driver dispatch and waiting areas, and employee parking. Scope also covered the demolition of existing structures and removal of underground tanks, […]
VA Mather Behavioral Health Inpatient Unit

Design and construction of a 14,127 SF behavioral health inpatient unit on an occupied Air Force Base. The LEED Silver facility includes a combination of secure single and double secure patient rooms, as well as administrative, support, and service areas. Project site improvements included parking lots, sidewalks, landscaping and security features. The foundation and roof deck […]