Scotts Valley Middle School

Preconstruction and construction services for the modernization of three classroom wings and multi-purpose building, and extensive site work to accommodate utilities work and accessible path of travel throughout the site. Scope also included construction of new admin and library buildings, three classroom buildings, and gym.
Serramonte Center Parking Structure

Design and construction of a 457,000 SF cast-in-place parking structure for a super-regional shopping mall. The 1,372 stall, five-level facility features a second-level pedestrian bridge with elegant glass railing system that connects to the mall. Four EV charging stations and provisions for 94 additional stalls were provided. Scope also covered utility relocation and site preparation. […]
Center Street Berkeley Parking and Retail

New 248,000 SF double helix parking structure featuring artistic metal panels, lighting, and an art deco staircase. Scope covered demolition of the existing 440 parking space garage and replacement with the new eight-level structure that provides parking for 720 cars and 350 bicycles. Located in a congested urban area, flexible 3-lane vehicle access allows for […]
University of California, Davis – Kemper Hall Clean Room

Laboratory conversion into a 60,000 SF Clean Room Lab Hub with specialty equipment. Scope included the installation of 14 non-hazardous gas lines and 8 hazardous gas lines, all with specialty fabricated stainless steel piping. A process chilled water system with copper piping, three new exhaust ducting systems, and a Toxic Gas Management system were also […]
Palm Valley Water Reclamation Facility

Expansion of an existing water reclamation facility under CMAR delivery to increase the treatment capacity to 5.8 MGD. Scope included two new SBR basins, retrofitting the headworks with new influent screen, grit washer and removal system, new blowers/electrical building, new odor control system, replacement of filter feed pumps with two new vertical turbine pumps, replacement […]
Vietnam Town Parking Structure

Design and construction of a 167,000 SF cast-in-place parking structure for a multi-phase development spanning 6 acres. The four-level, 517 stall facility includes 65 short-term and 65 long-term bicycle spaces. We self-performed the vertical and horizontal formwork, as well as embeds and layout. Coordination with adjacent construction projects that the owner had underway at the […]
Napa Material Reuse Facility

Design and construction of the City of Napa’s Compost Facility improvements included a covered aerated static pile (CASP) drying system consisting of covered concrete bunkers with in-slab aeration piping to expedite the composting process. The project also included modifications to the facility’s existing stormwater management system through a series of earthen settling and filter ponds. The scope of work included […]
Dixon Wastewater Treatment Plant

Expansion to an existing wastewater treatment plant to address the long-term problem of salinization of the soils and groundwater in Dixon, CA. Improvements included a new influent pump station and headworks, two oxidation ditches with anoxic basins and splitter structures, two secondary clarifiers, RAS/WAS pump station, secondary scum pump station, new operations building, solids stabilization […]
Miner’s Ranch Water Treatment Plant Improvements

Upgrades and expansion to an existing water treatment plant that increased capacity from 14 MGD to 21 MGD. Scope covered modifications to the raw water pump station with a new feed pump and in-line jet mixing system, addition of new adsorption clarifiers for pretreatment, construction of deep bed sand filters with coupled new air scouring […]
San Francisco Airport Fire House No. 3 & South Field Checkpoint Relocation

New LEED Gold designed facility includes an 8,000 SF five-bay apparatus garage with four electric doors for faster response time, a 12,000 SF administration office, and firefighter house that serves as the primary response center for emergencies at Terminal One. The South Field Checkpoint includes a prefabricated guard shelter structure, high speed entry and exit […]