Albany Public Works Service Center

Design and construction of two structures on an approximately one-acre site. The main two-story building is a 16,000 SF pre-engineered steel structure with metal siding and an elevated concrete deck. The first floor is designated for the fleet program and features a warehouse and various shops. The second floor consists of office space that features […]

Oakland Zoo California Trail

This project doubled the size of the zoo complex to roughly 100 acres with 26 new structures, and features a new European-style, aerial gondola system. Scope covered new infrastructure and buildings including: The Landing Café,  Visitor’s and Interpretive Center Buildings, Interpretive Outlook, Lower Gondola Loading Building, Pump Station, boardwalk, a new service road, and site […]

KIPP Heritage Charter School

New construction of a 25,000 SF charter school campus with a collaborative environment design. It is arranged as a series of courtyards with a central open space that features a stage and amphitheater to serve as the primary gathering area. Five classroom buildings, each containing a cluster of four classrooms, are arranged around a series […]

NASA Ames Research Center Arc Jet Replacement

Construction of three new steam boilers to replace the existing system that supports NASA’s Arc Jet Complex. Major coordination required for multiple utility crossings to the new facility, plus in slab electrical, mechanical and structural work. Scope also covered related building modifications to the existing control room.

Scotts Valley Middle School

Preconstruction and construction services for the modernization of three classroom wings and multi-purpose building, and extensive site work to accommodate utilities work and accessible path of travel throughout the site. Scope also included construction of new admin and library buildings, three classroom buildings, and gym.

Serramonte Center Parking Structure

Design and construction of a 457,000 SF cast-in-place parking structure for a super-regional shopping mall. The 1,372 stall, five-level facility features a second-level pedestrian bridge with elegant glass railing system that connects to the mall. Four EV charging stations and provisions for 94 additional stalls were provided. Scope also covered utility relocation and site preparation. […]

Center Street Berkeley Parking and Retail

New 248,000 SF double helix parking structure featuring artistic metal panels, lighting, and an art deco staircase. Scope covered demolition of the existing 440 parking space garage and replacement with the new eight-level structure that provides parking for 720 cars and 350 bicycles. Located in a congested urban area, flexible 3-lane vehicle access allows for […]

University of California, Davis – Kemper Hall Clean Room

Laboratory conversion into a 60,000 SF Clean Room Lab Hub with specialty equipment. Scope included the installation of 14 non-hazardous gas lines and 8 hazardous gas lines, all with specialty fabricated stainless steel piping. A process chilled water system with copper piping, three new exhaust ducting systems, and a Toxic Gas Management system were also […]

Palm Valley Water Reclamation Facility

Expansion of an existing water reclamation facility under CMAR delivery to increase the treatment capacity to 5.8 MGD. Scope included two new SBR basins, retrofitting the headworks with new influent screen, grit washer and removal system, new blowers/electrical building, new odor control system, replacement of filter feed pumps with two new vertical turbine pumps, replacement […]

Vietnam Town Parking Structure

Design and construction of a 167,000 SF cast-in-place parking structure for a multi-phase development spanning 6 acres. The four-level, 517 stall facility includes 65 short-term and 65 long-term bicycle spaces. We self-performed the vertical and horizontal formwork, as well as embeds and layout. Coordination with adjacent construction projects that the owner had underway at the […]