USPS Process & Distribution Center Expansion and Renovation

Construction of 135,000 SF tilt-up concrete and masonry addition complete with all major building systems, paving and landscaping, plus the relocation and construction of a new Bulk Mail Entry Unit building. Scope also covered renovations and alterations to numerous areas throughout the 200,000 SF existing facility. The large expansion to existing USPS facility includes space […]
Army Reserve Regional Readiness Sustainment Command Headquarters

Design and construction of three buildings – Armed Reserve Center, Army Reserve Regional Readiness Sustainment Command Headquarters, and Fitness Center – totaling 279,000 SF across a 30-acre site. The LEED Silver buildings provide administrative, meeting, training, and equipment spaces. Scope included a new gymnasium and 225-seat theater. Our design-build team self-performed all the structural concrete […]
LBNL Advanced Light Source User Support Building

Design and construction of a LEED Gold facility that supports LBNL’s Advance Light Source (ALS) Building, which houses a specialized particle accelerator that generates bright beams of x-ray light for scientific research. The new 31,000 SF facility contains staging for experiments, labs, storage spaces, conference rooms and offices. Construction is slab-on-grade, light/heavy gauge metal framing […]
Stanford Linear Accelerator Research Building 52

Design and construction of a 64,000 SF, LEED Gold office building that houses Stanford’s control room for the multiple accelerators on its campus. The structural design for the new building was based on a sustainable, integrated systems approach. Construction included a unique rain screen system that utilizes a Norwegian weatherproof material. The outside wall was […]
Port of Oakland Field Support Services Complex

Construction of two new buildings totaling 60,117 SF on a six-acre highly secured site. This included a two-story warehouse and business administration building with a mezzanine. The other building houses a vehicle wash. Scope also covered a bioretention area.
United Parcel Service Container Rail Hub Facility

The 160,000 tilt-up and auxiliary facility is a major distribution center for UPS. The project consisted of rail track work, distribution, storage, delivery, and offices as well as complete site development.
Richmond Transit Station

Construction of a transit station that is the “jewel” of the Richmond Transit Village. Many features were incorporated to aesthetically improve the landscape of the local community. This includes a new BART elevator housed within a conical tower clad in multi-colored aluminum, a 3,200 SF aluminum clad enclosed structure, a 11,250 SF canopy roof structure […]
Deuel Vocational Institute Groundwater and Non-Potable Water Distribution System

Construction of a 1 MGD groundwater treatment plant designed to remove salt from the drinking water supply system. This included the world’s first on-site installation of a Brine Concentrator System (BCS) for a municipal drinking water system. The stainless steel and titanium BCS measured 92 FT tall and weighed 95,000 lbs. Scope also covered solar […]
South County Water Supply Program

This 40 MGD project provides drinking water for the Cities of Oakdale, Escalon, Manteca and Tracy. The process design utilized Ozonia dissolved air flotation pretreatment, lime stabilization by RDP, Zeenon Zeeweed 1000 submerged membrane equipment and Pulsafeeder chemical feed systems. Source water from the Woodard Reservoir is treated. On-site chemical feed systems include ferric chloride, […]
Atwater Bert Crane Wastewater Treatment Plant Improvements

Construction of a new 6 MGD treatment plant. The project included all wastewater treatment processes from headworks through UV disinfection. Solids management was handled through aerobic digesters and screw presses. New buildings include a 3,200 SF administration building containing a laboratory, electrical power, instrumentation, and facilities. Two pre-engineered metal buildings were also provided: a 2,400 […]