Kaiser Oakland Garage #1

Construction included a 3?-6? thick mat slab foundation. Overaa poured 5339 cubic yards of concrete for the foundation over a 24 hour period. This required 594 deliveries - one every 1.6 minutes with 66 mixer trucks. Adjacent occupied buildings with a limited laydown area.