Windsor SECONDARY TREATMENT SYSTEM UPGRADES PROJECT

General Work Description: The work consists of dewatering the Water Reclamation Facility’s aeration basin, further excavation and installation of a new concrete aeration basin facility with a flow splitting structure, air lines, diffusers, a mixing system, a surface wasting pumping system, and a high flow return pump connected to the adjacent high flow storage pond. […]

Alhambra HS Bldg. F & Modernizations D/B

Scope: Demolition of existing classroom building “F”, replace with 22,628 SF new two story wood framed classroom building and associated site work. Modernization of existing buildings A, B, & C. Mechanical, Plumbing, and Electrical campus wide modernization and updates. DBE team to get final approval from District prior to finalizing construction documents. Refer to appendix […]

Delta Diablo SECONDARY PROCESS IMPROVEMENTS PHASE 1

In accordance with Drawings and Specifications prepared by HDR Engineering, Inc., the Work includes furnishing of all labor, materials, tax, equipment, incidentals and services for the construction and completion of the Secondary Process Improvements Phase 1 (“Project”). The Work includes but is not limited to construction of three (3) new aeration basins, one (1) new […]

Monterey One: CP361 RENEWABLE ENERGY IMPROVEMENTS PROJECT

Construction of the CP361 Renewable Energy Improvements Project at the Monterey One Water Regional Treatment Plant. Work involves replacement of digester gas piping and gas safety equipment and associated supports, replacement of two access roof hatches (cover and frame) on each digester with provisions for concrete repair, recoating interior headspace of each digester, concrete repairs […]