The work covered by this contract will be performed in Richmond, CA. The work includes, but is not
limited to, the following:
1. Sedimentation Basin No. 1 (SSB No. 1):
a. Procurement of the equipment for SSB No.1 will be covered by the Owner
under a separate Procurement Contract. Contractor shall install
Owner procured equipment for SSB No.1.
b. Removal and replacement of the No. 3 water system, including piping, valves,
supports, hose reel system, and appurtenances.
c. Removal and replacement of 18 precast concrete walkway panels along SSB
Nos. 1 and 2 (as shown on the Drawings), replaced in kind.
d. Removal and replacement of two sluice gates along SSBs Nos. 1 and 2 (as
shown on the Drawings).
e. Miscellaneous concrete surface restoration and crack repair.
f. Upgrades to electrical components, including modifications to existing
electrical systems to support new collector equipment and integration with the
existing control system.
2. Sedimentation Basin No. 2 (SSB No. 2):
a. Procurement of the equipment for SSB No.2 will be covered by the Owner
under a separate Procurement Contract. Contractor shall install
Owner procured equipment for SSB No.2.
b. Removal and replacement of existing chain-and-flight mechanisms and
accessories, including drives, motors, wall bearing supports, sprockets, flights,
shafts, and chains.
c. Removal and replacement of the No. 3 water system, including piping, valves,
supports, hose reel system, and appurtenances.
d. Removal and replacement of 18 precast concrete walkway panels along SSB
Nos. 1 and 2 (as shown on the Drawings), replaced in kind.
e. Removal and replacement of two sluice gates along SSBs Nos. 1 and 2 (as
shown on the Drawings).
f. Miscellaneous concrete surface restoration and crack repair.
g. Upgrades to electrical components, including modifications to existing
electrical systems to support new collector equipment and integration with the
existing control system.
3. Contractor shall perform all cleaning of SSBs No. 1 and 2 necessary to achieve
sanitary working conditions and to prepare surfaces for required tasks.
Contractor shall include sufficient time in the schedule to perform the cleaning, and
no delay shall be claimed.
4. The existing facility must be always kept in operation.
Project Stabilization Labor Agreement
West County Wastewater has established the following
goals for employment of West County Wastewater Residents:
1. At least 50% of the total work hours for the West County Wastewater Project shall be
performed by West County Residents.
2. At least 50% of New Hires for the West County Wastewater Project shall be West County
Residents for the duration of the West County Project.