Bid Details for COMMUNITY FACILITIES DISTRICT (CFD) NO. 18 PHASE 2A PUMP STATION IMPROVEMENTS PROJECT, Folsom

Project
COMMUNITY FACILITIES DISTRICT (CFD) NO. 18 PHASE 2A PUMP STATION IMPROVEMENTS PROJECT, Folsom
Owner
City of Folsom
Bid Time
12/09/2026 2:00 pm
Description

Location, Description, and Completion of Work:  This project is located at the City of Folsom Water Treatment Plant located at 194 Randall Drive, Folsom, CA.  The work to be done is shown on the Plans, and generally consists of, but is not limited to, furnishing all labor, materials, and equipment to install pumping facilities; all trenching and backfilling; all piping; all paving, at-grade improvements; all structural facilities, all geotechnical work, all site work and grading; all electrical, instrumentation and control; and all miscellaneous work as shown on the Contract Drawings and included in the project documents.

All work shall be completed within 480 calendar days after the date of the written Notice to Proceed from the TOLL BROS., INC

Location
Folsom, CA
Amount
$8,820,000
Bid Walk

Non-Mandatory Pre-Bid Conference: A non-mandatory Pre-Bid Conference will be held at the WTP Plant, 194 Randall Drive Folsom, CA 95630 on Monday November 30, 2026 at 10:00 A.M. Bidders are to park on Willow Creek Drive near the trail corridor located southeast of the WTP

Requirements
Availability
Obtaining or Inspecting Contract Documents: Copies of the proposal forms and accompanying documents (project manual and specifications) will be available starting Thursday, November 12, 2026 at 4:00 P.M. on Bid America (https:/ https://www.bidamerica.com/).