Work includes rehabilitation of covered and open concrete structures; relining, modification, or
replacement of small and large diameter steel and ductile iron pipes and their associated pipe
supports; replacement or installation of valves and piping appurtenances and their associated
electrical and instrumentation scope; installation and operation of a temporary 11 MGD pumped
bypass; rehabilitation of reactor mixer and aerator; installation of new or improvements to
existing instrumentation and their associated electrical and instrumentation scope; rehabilitation
and replacement of motor control center components; modifications to existing sluice gates and
installation of new slide gates; installation of platforms and access improvements to open
concrete structures; rerouting of sump pump discharge lines; excavation and trench work; and
surveying of key points in and around the reactors.
Estimated cost of this work is between $18,500,000 and $19,500,000.
This project will require multiple trades and types of work; for example (note: this list is not all inclusive):
demolition, saw-cutting, concrete coring, hazardous materials handling, grading,
excavation, shoring, fill, concrete, rebar, waterproofing, painting, industrial coatings, structural
steel, bolting, welding, mechanical, electrical, pipeline, plumbing, crane equipment, handrails,
guardrails, ladders, gratings and railings, doors and windows, paving, pumped bypass systems,
surveying, and other required work and trades. For additional description and information, see
Document 00 41 01 – Bid Form, Document 00 41 05 – Description of Bid Items, Section
01 11 00 – Summary of Work, and the remaining contract documents.
All work covered by the contract shall be completed within six-hundred and twenty-seven (627)
calendar days after the issuance of the Notice to Proceed.