Willie L. Brown, Jr. Middle School

Design and construction of a new middle school campus. New construction consisted of 88,500 SF of space within two new structures. This includes a new 60,800 GSF, three-story building containing classrooms, administration, wellness center, multi-purpose room, library, kitchen, and associated support spaces and facilities. A new 28,200 GSF, two-story building houses additional classrooms, performing arts […]
Monta Vista High School New Student Center & Quad Modernization

New 44,200 SF two-story student center plus renovation, reconfiguration, and reconstruction of the student quad and front drop-off area. The new student center features a college-style cafeteria and kitchen equipped with several stove tops, exhaust hoods, refrigerators, and monitor screens to display menus. The facility also houses programming and physics labs, restrooms, an electrical room, […]
University of California, Berkeley – Evans Diamond Field Lights and Scoreboard

Installation of new 90′ light poles and a new 38′ x 31′ LED Scoreboard with video display. Scope also included fencing, access, and ADA renovation work at the press booth. Self-performed work covered all concrete and asphalt work, turf repair and modifications, and majority of excavation. Overaa coordinated weekly meetings between the baseball team and […]
Serramonte Center Parking Structure

Design and construction of a 457,000 SF cast-in-place parking structure for a super-regional shopping mall. The 1,372 stall, five-level facility features a second-level pedestrian bridge with elegant glass railing system that connects to the mall. Four EV charging stations and provisions for 94 additional stalls were provided. Scope also covered utility relocation and site preparation. […]
University of California, Davis – Kemper Hall Clean Room

Laboratory conversion into a 60,000 SF Clean Room Lab Hub with specialty equipment. Scope included the installation of 14 non-hazardous gas lines and 8 hazardous gas lines, all with specialty fabricated stainless steel piping. A process chilled water system with copper piping, three new exhaust ducting systems, and a Toxic Gas Management system were also […]
Palm Valley Water Reclamation Facility

Expansion of an existing water reclamation facility under CMAR delivery to increase the treatment capacity to 5.8 MGD. Scope included two new SBR basins, retrofitting the headworks with new influent screen, grit washer and removal system, new blowers/electrical building, new odor control system, replacement of filter feed pumps with two new vertical turbine pumps, replacement […]
Vietnam Town Parking Structure

Design and construction of a 167,000 SF cast-in-place parking structure for a multi-phase development spanning 6 acres. The four-level, 517 stall facility includes 65 short-term and 65 long-term bicycle spaces. We self-performed the vertical and horizontal formwork, as well as embeds and layout. Coordination with adjacent construction projects that the owner had underway at the […]
Napa Material Reuse Facility

Design and construction of the City of Napa’s Compost Facility improvements included a covered aerated static pile (CASP) drying system consisting of covered concrete bunkers with in-slab aeration piping to expedite the composting process. The project also included modifications to the facility’s existing stormwater management system through a series of earthen settling and filter ponds. The scope of work included […]
Dixon Wastewater Treatment Plant

Expansion to an existing wastewater treatment plant to address the long-term problem of salinization of the soils and groundwater in Dixon, CA. Improvements included a new influent pump station and headworks, two oxidation ditches with anoxic basins and splitter structures, two secondary clarifiers, RAS/WAS pump station, secondary scum pump station, new operations building, solids stabilization […]
Miner’s Ranch Water Treatment Plant Improvements

Upgrades and expansion to an existing water treatment plant that increased capacity from 14 MGD to 21 MGD. Scope covered modifications to the raw water pump station with a new feed pump and in-line jet mixing system, addition of new adsorption clarifiers for pretreatment, construction of deep bed sand filters with coupled new air scouring […]