San Francisco Airport Fire House No. 3 & South Field Checkpoint Relocation

New LEED Gold designed facility includes an 8,000 SF five-bay apparatus garage with four electric doors for faster response time, a 12,000 SF administration office, and firefighter house that serves as the primary response center for emergencies at Terminal One. The South Field Checkpoint includes a prefabricated guard shelter structure, high speed entry and exit […]

Roseville Oak Street Parking Structure

Design-assist delivery of a new 150,600 SF parking structure. The seven-level, 432 stall facility features EV charging stations, plus designated spaces for ADA, clean air vehicle/carpool, motorcycles, and bicycles. Security features include cameras at every entrance and exit, as well LED lighting throughout the garage. Self-performed work included the foundation. Scope also covered ancillary public […]

San Francisco International Airport South Tenant Relocation

Tenant improvements and new construction to San Francisco International Airport’s (SFO) West Field and North Field Cargo buildings. This included renovations to 40,000 SF of office space and warehouse space. Scope covered Ground Service Equipment (GSE), maintenance, office, and client service spaces to relocate Airport Commission leasing tenants, such as third-party airline service providers. Construction […]

EPACENTER ARTS

New 25,000 SF East Palo Alto Youth Arts and Music Center that supports artistic programming and collaborations by arts organizations. The new facility features a series of linked buildings with architectural curves housing a main lobby, cafe, visual arts, recording and dance studios, office space, youth and community spaces, and performance theater. Exterior improvements included […]

Park SFO

New cast-in-place, seven-story, 500,000 SF parking facility expansion that provides long term parking for 1,533 cars. To save costs, vehicular ramps in the existing structure were utilized to service the new expansion and the existing garage. Two vehicle bridges on each level connect the new and existing structures. The separation accommodates seismic and existing foundation […]

Confidential Client Innovation Center

Complete interior renovation of the first and second floor of an existing building. The occupied campus tenant improvement project covered 72,608 SF and included the removal of walls, new ceiling and lighting, updated finishes, renovation to break areas, a new roof, and two new revolving doors. Core infrastructure upgrades included replacement of the building’s air […]

La Clinica Medical Office Building Expansion

Expansion transforming a retail space into a 26,000 SF state-of-the-art medical facility. Major tenant improvements were required. This included demolition and abatement, new MEP and fire sprinkler systems, structural systems and seismic upgrades, new interior and exterior improvements, roofing, and site work. Seismic upgrades involved the installation of tie-backs and full structural underpinning of existing […]

Fremont Bank Headquarters

A Silicon Valley Business Journal Structures award winner for Best Office Building (small category), this six-story, steel frame structure serves as the new headquarters for one of California’s oldest, independent, family-owned and managed banks. Located in Fremont’s downtown, this project revitalizes the commercial district. The building features a roof top gathering place, all-glass frontage doors, […]

Confidential Refinery Client Maintenance & Shop Building

New 105,500 SF critical facility for a leading multinational energy corporation’s refinery. The high performance facility is a combination of pre-engineered metal building shell along with custom structural elements and foundation support systems. It features shop spaces and offices to accommodate the entire refinery’s fabrication, repair, and maintenance needs in-house. This includes 40,000 SF dedicated […]

College Preparatory School Math & Student Life Buildings

Preconstruction and construction services for the replacement of aging facilities located in the middle of the College Prep High School campus. Our crew demolished the existing building and constructed the new 10,000 SF facility in its place.  The facility provides classrooms, a student social room, faculty and administrative offices, associated support spaces, and restrooms. Scope […]