Pleasant Hill Parking Structure

Construction of a four-level, 661 stall, post-tensioned parking structure. Scope also covered site improvements (elevator, lighting, and landscaping) plus demolition of the old structure.
Genentech Parking Structures

Design and construction of two cast-in-place parking structures to accommodate biotech’s South San Francisco campus growth. Parking Structure I is a 165,000 SF, five-level, 489 stall facility. Parking Structure II is a 199,767 SF , seven-level, 640 stall facility. Combined, Overaa placed 14,900 CY of concrete on the projects.
Tracy WWTP Expansion Phase 1B

Extensive expansion of an existing 30 MGD wastewater treatment plant. This included security upgrades, modifications to rainwater intake, new headworks, conversion of digester to Bio Filters, sludge storage tanks, new clarifier, new scum collection/handling, new groundwater pump stations, new blower building, and new chemical buildings. Seismic and structural improvements covered installation of new pipe supports […]
Turlock Wastewater Treatment Plant

Construction of 18 new concrete structures including a complete tertiary treatment plant. A mid-plant pumpstation featuring DensaDag high rate flocculation/sedimentation equipment and Aqua Aerobics cloth disk filtration facilities and two new digesters and one clarifier/thickener provided.
John Jones Water Treatment Plant Expansion

Expansion to an existing water treatment plant to reduce the City of Tracy’s reliance on well water as the source for their drinking water and to increase plant capacity to 30 MGD – almost double its previous size. Improvements included a new high rate flocculation/ sedimentation tank, new traditional GAC Filters and modifications to existing […]
Tamalpais High School

Construction and modernization of an existing high school campus. Overaa removed the existing pools and constructed a new swimming pool with a mechanical building. A new site glass elevator tower for accessibility on the mountainous site, a weight room and field house buildings, tennis courts, a basketball court, parking lot, and a student drop off […]
Las Positas College Center for the Performing Arts

New three-story LEED Silver facility with a 500 seat main theater designed by renowned designer of performing arts theater projects, John Sergio Fisher. Scope included a 150 seat black box theater and a 1,500 seat outdoor below grade amphitheater. The main audience chamber/stage is complete with a tension grid, catwalks, and grid iron deck. The […]
University of California, Berkeley – Memorial Stadium Seismic Retrofit

Seismic retrofits for historic century old stadium built directly on top of the Hayward Fault line. Scope included reinforcing the concrete scoreboard towers; a system of steel shores to support the existing concrete “bowl” of the stadium; a design-build system of egress protection; and miscellaneous architectural work. Overaa also provided steel light pole supports and […]
EBMUD Richmond Advanced Recycled Expansion

Construction of a 4 MGD microfiltration and reverse osmosis treatment facility to double the amount of reclaimed water that the Chevron Richmond, CA refinery can use on a daily basis. Scope included a 1 MG influent storage tank, 15,000 SF process equipment building, chemical storage and feed systems, 2 MG stainless steel product water storage […]
Berlex Biosciences

This occupied biotech project required building 12 new class 100 clean rooms and 4 new class 10,000 clean rooms. The 3-story, 73,000sf building included laboratories for a pharmaceutical pilot plant, a separate poured-in-place concrete structure to process hazardous waste, warehousing, tank storage and containment, and offices. Construction included a secondary containment system, special coating, exhaust […]