Woodland Wastewater Treatment Plant Expansion

Construction of tertiary treatment plant included aqua-aerobics cloth disk filters and Trojan UV disinfection system. Flood control improvements consisted of three miles of levee fortification. Treatment plant expansion covered the construction of aerated grit tank, 140’ primary clarifier, 300’ oxidation ditch, and a new 39” effluent pipeline. The existing shop and maintenance building was also […]
Kaiser Permanente Parking Structure, San Rafael

Partial demolition, expansion, and seismic upgrade of an existing parking structure. The new 117,600 SF addition is a pre-cast, four-level, hybrid structure that incorporated precast beams and columns, as well as cast-in-place upturned beams and post tension decks. It was designed so that the new and old structure were tied together by the foundation while […]
Edna Maguire New Elementary School

Two phase project that included demolition of the existing elementary campus and construction of the new elementary school. Phase 1 included the set up of portables for interim housing and demolition of existing campus, plus site utility work during an intense 120 day schedule. Student safety was paramount in the planning and construction of the […]
Sacramento Water Treatment Plants

Extensive rehabilitation of two City of Sacramento water treatment plants: the Sacramento River Water Treatment Plant (SRWTP) and the E.A. Fairbairn Water Treatment Plant (EAFWTP). SRWTP was upgraded to achieve the design-rated capacity of 160 MGD and included the addition of a new solids handling system. Major components of SRWTP included: demolition of existing structures, […]
Willie L. Brown, Jr. Middle School

Design and construction of a new middle school campus. New construction consisted of 88,500 SF of space within two new structures. This includes a new 60,800 GSF, three-story building containing classrooms, administration, wellness center, multi-purpose room, library, kitchen, and associated support spaces and facilities. A new 28,200 GSF, two-story building houses additional classrooms, performing arts […]
Monta Vista High School New Student Center & Quad Modernization

New 44,200 SF two-story student center plus renovation, reconfiguration, and reconstruction of the student quad and front drop-off area. The new student center features a college-style cafeteria and kitchen equipped with several stove tops, exhaust hoods, refrigerators, and monitor screens to display menus. The facility also houses programming and physics labs, restrooms, an electrical room, […]
University of California, Berkeley – Evans Diamond Field Lights and Scoreboard

Installation of new 90′ light poles and a new 38′ x 31′ LED Scoreboard with video display. Scope also included fencing, access, and ADA renovation work at the press booth. Self-performed work covered all concrete and asphalt work, turf repair and modifications, and majority of excavation. Overaa coordinated weekly meetings between the baseball team and […]
Richmond BART Parking Structure

Construction of a 318,000 SF cast-in-place mixed-use parking structure with 100% local Richmond workforce participation. The six-level, 770 stall structure includes ground level retail space to help revitalize the local community. Multiple public agency coordination was required on the project.
Stranda Apartments

New 4-level, mixed retail and apartment building in downtown Berkeley. Property features ground level retail space, 21 apartments, rooftop communal space, and below ground elevated lift garage.
John Swett High School, Phase I & II

New Administrative/Classroom Building and Arts Department, plus additions and modernization of an occupied campus. Phase I included modifications and additions to the existing buildings. Extensive interior renovations included: doors; windows; glazing; curtain walls; cabinets; acoustical tile and gypsum board ceilings; bathrooms; finishes including flooring, painting, ceramic tile, other wall coverings and wall base; and replacement […]