San Francisco Airport Fire House No. 3 & South Field Checkpoint Relocation

New LEED Gold designed facility includes an 8,000 SF five-bay apparatus garage with four electric doors for faster response time, a 12,000 SF administration office, and firefighter house that serves as the primary response center for emergencies at Terminal One. The South Field Checkpoint includes a prefabricated guard shelter structure, high speed entry and exit […]
Roseville Oak Street Parking Structure

Design-assist delivery of a new 150,600 SF parking structure. The seven-level, 432 stall facility features EV charging stations, plus designated spaces for ADA, clean air vehicle/carpool, motorcycles, and bicycles. Security features include cameras at every entrance and exit, as well LED lighting throughout the garage. Self-performed work included the foundation. Scope also covered ancillary public […]
Valero Lab & Maintenance Buildings

Construction of three new buildings to modernize and upgrade Valero Benicia’s quality control and maintenance facilities, plus office and employee fitness spaces. The 15,700 SF, single-story lab building features 6,300 SF of lab space. The interconnected two-story maintenance and office buildings total 47,000 SF. The maintenance building features a full maintenance shop for repairing refinery […]
The Wave, Emerald Glen Aquatic Center

Construction of a new boardwalk-style swimming facility and entertainment complex. The LEED Gold 31,000 SF facility features an indoor pool for year-round swimming and exercise programs. The outdoor six acre community park features a sports pool for competitive swimming and water polo. Waterpark elements include water slides and a splash pool with a beach entry […]
Oakland Zoo California Trail

This project doubled the size of the zoo complex to roughly 100 acres with 26 new structures, and features a new European-style, aerial gondola system. Scope covered new infrastructure and buildings including: The Landing Café, Visitor’s and Interpretive Center Buildings, Interpretive Outlook, Lower Gondola Loading Building, Pump Station, boardwalk, a new service road, and site […]
KIPP Heritage Charter School

New construction of a 25,000 SF charter school campus with a collaborative environment design. It is arranged as a series of courtyards with a central open space that features a stage and amphitheater to serve as the primary gathering area. Five classroom buildings, each containing a cluster of four classrooms, are arranged around a series […]
NASA Ames Research Center Arc Jet Replacement

Construction of three new steam boilers to replace the existing system that supports NASA’s Arc Jet Complex. Major coordination required for multiple utility crossings to the new facility, plus in slab electrical, mechanical and structural work. Scope also covered related building modifications to the existing control room.
Scotts Valley Middle School

Preconstruction and construction services for the modernization of three classroom wings and multi-purpose building, and extensive site work to accommodate utilities work and accessible path of travel throughout the site. Scope also included construction of new admin and library buildings, three classroom buildings, and gym.
San Francisco International Airport South Tenant Relocation

Tenant improvements and new construction to San Francisco International Airport’s (SFO) West Field and North Field Cargo buildings. This included renovations to 40,000 SF of office space and warehouse space. Scope covered Ground Service Equipment (GSE), maintenance, office, and client service spaces to relocate Airport Commission leasing tenants, such as third-party airline service providers. Construction […]
Goodrick Industrial Buildings 1 & 2

171,000 SF industrial distribution center consisting of two concrete tilt-up buildings on a 10-acre site in Richmond, CA. Building One is a 133,000 SF building with 4,800 SF of office space. We completed foundations and slab-on-grade to use as casting beds for panel formation in a month and a half. Our crew formed a total […]