Bid Details for Sutter Health Santa Clara West Garage (Design-Build)

Project
Sutter Health Santa Clara West Garage (Design-Build)
Owner
Sutter Health
Bid Time
09/08/2026 2:00 pm
Description
Project will be consist of new 8 story parking structure with 1,397 parking stalls.
Project includes the following:
· Design, Permitting and Construction of garage
· Power and Conduit required for Security
· Infrastructure necessary for EV Chargers
· Landscaping and other utilities surrounding garage per markup
· Connections to utilities; coordinated with hospital GC
· Infrastructure necessary for Future Solar Array on roof
· Infrastructure necessary for Future Solar Array Battery Bank
 
Preliminary Schedule
Design & permitting: November 2026 thru October 2027
Construction: January 2028 thru June 2029
Location
2811 Mission College Boulevard, Santa Clara
Amount
Bid Walk
Requirements
Availability