The work consists in general of replacement of Pumps No. 3 and No. 4. at the Primary Influent Pump Station No. 1 , rehabilitation of Primary Influent Flumes Nos. 1 and 2, the pressurization systems for Primary Flotator Nos. 1 and 2, Primary Sludge Pump Station No. 1 serving Primary Flotator Nos. 1 and 2, replacement of existing MCCs, PLC and electrical equipment serving Primary Flotator Nos. 1 and 2, additions and modifications to grading, paving, and drainage systems, and repair and reconstruction to existing facilities affected by the work .
The work includes all necessary labor, materials, tools, equipment and any incidentals needed to perform the improvements as described in the contract documents. The basis of award of bid is the lowest base bid without consideration of bid alternates.
The work on this project shall be substantially completed on or before the expiration of three hundred fifty (350) working days