Bid Details for PRIMARY FLOTATOR IMPROVEMENTS PROJECT, Turlock

Project
PRIMARY FLOTATOR IMPROVEMENTS PROJECT, Turlock
Owner
City of Turlock
Bid Time
11/10/2026 1:00 pm
Description

The work consists in general of replacement of Pumps No. 3 and No. 4. at the Primary Influent Pump Station No. 1 , rehabilitation of Primary Influent Flumes Nos. 1 and 2, the pressurization systems for Primary Flotator Nos. 1 and 2, Primary Sludge Pump Station No. 1 serving Primary Flotator Nos. 1 and 2, replacement of existing MCCs, PLC and electrical equipment serving Primary Flotator Nos. 1 and 2, additions and modifications to grading, paving, and drainage systems, and repair and reconstruction to existing facilities affected by the work .
The work includes all necessary labor, materials, tools, equipment and any incidentals needed to perform the improvements as described in the contract documents. The basis of award of bid is the lowest base bid without consideration of bid alternates.

 

The work on this project shall be substantially completed on or before the expiration of three hundred fifty (350) working days

Location
Turlock Regional Water Quality Control Facility, 901 S. Walnut Road, Turlock, California 95380
Amount
$17,000,000
Bid Walk

A Mandatory Pre-Bid conference will be held on Tuesday, October 27, 2026 at 1:00 pm at Turlock Regional Water Quality Control Facility, 901 S. Walnut Road, Turlock, California 95380. The purpose of the pre-bid conference is to provide a venue for bidders to view the site of work and ask questions of the designer and City staff.

Requirements
Availability
Complete sets of the Bidding Documents may be obtained from City’s selected e-procurement platform, OpenGov. Bidders must register for an OpenGov account (see https://procurement.opengov.com/signup), then visit City’s OpenGov portal page at https://procurement.opengov.com/portal/cityofturlock.