Chevron Refinery Building 71 Seismic Upgrade
The Technology Center supports alternative fuel research and product improvements for the Richmond campus. Building 71 is composed of three separate structures with seismic isolation joints between them. The project includes a voluntary strengthening of existing concrete walls and columns in addition to new exterior concrete buttresses supported on new deep pile foundations. Shotcrete wall overlays, steel channel […]
UCSF Benioff Campus Infrastructure Improvements
Major infrastructure upgrades to an occupied hospital campus, including a large scale retention system along highway 24 and utility reconfiguration to make the site ready for UCSF Benioff’s vision for their new Oakland Children’s Hospital Campus. As part of the structural scope, Overaa will install a massive 30′ high by 500′ long retaining system along […]
Palace Theater Bay Area Technology Charter School
The Palace Theater, first built in 1923, was used for vaudeville performances before it became a movie theater in 1931, then a church in 1952. Closed since 2013, the Palace Theater is being reimagined as a three-story STEM-focused charter school for Bay Area Technology Charter School, Oakland. It was named redevelopment of the year for […]
UCSF Benioff Structure Relocation
UCSF Benioff Children’s Hospital is growing its Oakland medical campus with the addition of a state-of-the-art medical office building across the street from its main hospital. To clear the path for the new MOB, two existing structures of historical significance must be carefully moved one block away and preserved. The relocated structures will be renovated […]
Achieve Academy
Design and construction of a new two-story classroom building for TK-5th grade students consisting of 16 standards classrooms, 2 science classrooms, 2 art rooms, several SPED spaces, flex space/meeting space, a teacher lounge, administration space, and childcare center. The scope of work also includes the full HVAC renovation and modernization of the existing Building A, new […]
Urban Tilth Farm
Urban Tilth is a resident-led organization in Richmond, CA that hires and trains local residents to cultivate agriculture and feed the community. Overaa is partnering with the group to help build the North Richmond Farm, a neighborhood farm and community gathering place. Built in several phases, the project includes ground improvements and utility work, greenhouse, […]
Portside Commerce Center Terminal 3 Industrial Building
The 202,371 SF manufacturing warehouse includes multi-level office spaces and mezzanine. The 691,000 SF project site area required ground improvement, new site improvement and underground utilities. The building is constructed with concrete tilt-up wall panels.
San Leandro High School New Gymnasium
Overaa is constructing a new state-of-the art gymnasium for the San Leandro Unified School District. The 55,000 square foot facility includes three courts and approximately 3,000 seats as well as academic and athletic support spaces. The work includes site improvements and demolition of an existing gymnasium on campus.
LBNL Welcome Center
Lawrence Berkeley National Laboratory’s new Welcome Center will serve as a cafeteria, conference center, clinic, badging office and transit hub for staff and scientists. The project is being completed in two phases. Phase A includes demolition of existing buildings, upgrading underground utilities, and site preparation for the new facility. Located near the Hayward fault, seismic […]