UCSF Benioff Campus Infrastructure Improvements

Project Details

Major infrastructure upgrades to an occupied hospital campus, including a large scale retention system along highway 24 and utility reconfiguration to make the site ready for UCSF Benioff’s vision for their new Oakland Children’s Hospital Campus. As part of the structural scope, Overaa will install a massive 30′ high by 500′ long retaining system along an active freeway to make room for new campus improvements.

Owner
UCSF Benioff
Location
Oakland, CA