Santa Rosa Memorial Parking Structure

Design and construction of a 216,380 SF post tensioned, cast-in-place concrete parking structure on an occupied hospital campus. The new six-level, 604-stall facility was built simultaneously with the new adjacent Medical Office Building (MOB), which was constructed by another general contractor (GC). Careful coordination with the other GC on concrete pour schedules, traffic, pedestrian access/right-of-ways, […]
Stanislaus Regional Water Authority Water Treatment Plant

Design and construction of a 30 MGD surface water treatment facility to diversify the regional water supply, allow for drought water management, improve water quality, and help replenish ground water supplies. Scope included all structures within the treatment plant footprint, yard piping, and all the concrete work, as well as the process equipment installation. A […]
Fresno Airport Terminal Parking Structure

Design and construction of a 4-story parking structure built directly across from the airport terminal. The parking structure has a footprint of 80,300 SF and is 318,000 gross square feet in total. The facility utilizes a new automated parking guidance system, which includes intuitive wayfinding and signage system, license plate recognition software, as well as […]
Las Juntas Elementary School

Design and construction of a new 45,000 SF school to replace the existing occupied school facility. New construction included: 23 classrooms; library; multipurpose room with stage and warming kitchen; and administrative offices. Scope also covered demolition of existing buildings and construction of new playground and landscape areas, plus an outdoor lunch shelter. We self-performed the […]
Jefferson Elementary School District Workforce Housing

This 50,600 SF design-build development provides 56 affordable units in a variety of sizes for district teachers, staff and their families. The complex was built on the MP Brown Elementary School site in Daly City, CA using 118 modular, prefabricated units. In addition to the three- and four-story residential buildings, a site-built community building serves […]
Ocean View Elementary School Re-Build

Design and construction of a new 53,000 SF net-zero ready campus. Joint use and shared community spaces guided the design principles of the project. Scope included a two-story building for grades 1-5, TK-K buildings, plus the modernization of the multi-purpose room and attached classrooms. Our crew self-performed the concrete and wood framing.
Kaiser Los Gamos Parking Structure

Design and construction of 165,550 SF cast-in-place parking structure that serves as a critical infrastructure component of a Medical Office Building development. Extensive coordination was required with the other General Contractor building the adjacent Medical Office Building concurrently. The new three-level, 435-stall parking facility features a top-level 700kW photovoltaic (PV) system. We self-performed the structural […]
Waste Management Organic Material Processing Facility

Design and construction of a 90,000 SF organic material processing facility. Pre- and post-processing facilities were provided, including eight-lane enclosed Smartturn Composting System and covered aeration piping. Construction involved drilled pile foundations on top of a landfill site. Scope also covered sitework, structural concrete for foundations and lane turners walls, HVAC, and electrical work. Preparation […]