Bid Details for Scotts Valley Vine Hill and Brook Knoll ES Modernizations

Project
Scotts Valley Vine Hill and Brook Knoll ES Modernizations
Owner
Scotts Valley Unified School District
Bid Time
11/19/2026 2:00 pm
Description
THIS IS AN OVERAA PROJECT
 
Overaa is the Lease-Leaseback General Contractor for the Scott’s Valley Vine Hill and Brook Knoll Elementary School Modernization Projects.
 
This project includes multiple DSA projects as follows:
  1. DSA App #01-123270 Vine Hill Elementary Primary Playground
  2. DSA App #01-123268 Vine Hill Elementary MPR, Associated Sitework, and TK Playground
  3. DSA App #01-123269 Brook Knoll Elementary Package 1 – MPR, Kitchen, and Associated Sitework
  4. DSA App #01-123356 Brook Knoll Elementary Package 2 – After-School Childcare Center, Campus-Wide Fire Alarm, Playgrounds, New Portable 20, and Associated Path of Travel [Package will be provided in a forthcoming addendum]
Pricing
Provide a separate price for each of :
  1. Vine Hill Primary Playground Package
  2. Vine Hill MPR, Associated Sitework, and TK Playground Package
  3. Brook Knoll Elementary Package 1 – MPR, Kitchen, and Associated Sitework
  4. Brook Knoll Elementary Package 2 – After-School Childcare Center, Campus-Wide Fire Alarm, Playground, New Portable 20, and Associated Path of Travel [PACKAGE FORTHCOMING VIA ADDENDUM]
  5. Combination discount should both schools be awarded to a single bidder.
Scope of Work
 
VINE HILL:
Primary Playground Package:
Work includes survey, site preparation and grading; paving; utilities (storm only); site concrete; pavement markings/striping; landscaping.
Owner furnished, owner installed scope: salvage and reinstall of existing playground equipment; new playground equipment; new playground surfacing.
 
MPR, Associated Sitework, and TK Playground Package:
Work includes installation of one new 9,210 SF Modular Multi-Purpose Building and new TK Playground, along with requisite sitework including survey, site demolition, site preparation and grading, site utilities, rebar, concrete PPF, metal fabrications, railings, FRP, insulation, fiber cement siding, doors, frames, hardware, framing and drywall, acoustical ceilings, signage, specialties, folding table assemblies, site furnishings, play ground equipment – ball walls only, electrical/low voltage systems, fire alarm, asphalt, site concrete, pavement markings/striping, landscaping, bioretention, fence and gates, and path of travel.
 
BROOK KNOLL:
MPR, Associated Sitework Package:
Work includes installation of one new 6,990 SF Modular Multi-Purpose Building, along with requisite sitework including survey, site demolition, site preparation and grading, site utilities, rebar, concrete PPF, metal fabrications, FRP, insulation, fiber cement siding, doors, frames, hardware, framing and drywall, acoustical ceilings, signage, specialties, folding table assemblies, site furnishings, play ground equipment – ball walls only, electrical/low voltage systems, fire alarm, asphalt, site concrete, pavement markings/striping, landscaping, bioretention, fence and gates, and path of travel.
 
BY OTHERS:
Work to be performed by others under separate contract:
  • Modular Frames and Erection
  • Metal Decking
  • Roofing
  • Flashings
  • Downspouts
  • Aluminum Storefront Glazing Systems
  • Flooring
  • Epoxy Flooring
  • Ceramic Tile
  • Painting
  • Foodservice
  • Fire Sprinklers
  • Plumbing
  • Grease Interceptor
  • HVAC
  • Electrical at MPR only: rough-ins, lighting, power, infrastructure for low voltage systems
  • PV
 
Located at 151 Brook Knoll Drive, in Santa Cruz, Santa Cruz County, California and 151 Vine Hill School Road, in Scotts Valley, Santa Cruz County, California.
 
Disabled Veteran Business Enterprise (DVBE) participation is encouraged.
Apr 5, 2027
Mar 13, 2028
Location
Scotts Valley, CA
Amount
Bid Walk
Requirements
Availability