EBMUD WALNUT CREEK WATER TREATMENT PLANT FILTERS IMPROVEMENTS, SPECIFICATION 2189
Work includes:
1. Filters 1 through 4:
a. Demolish existing Wheeler Bottom underdrains.
b. Replace and provide new underdrains, troughs, media, stop logs, applied channel
overflow pipes, valves, and gaskets.
c. Demolish existing surface wash piping; furnish, install, and demolish temporary
surface wash piping. Furnish and install new air scour piping.
d. Furnish and install new lighting panel.
2. Filters 5 through 8:
a. Replace and provide new troughs and valves.
b. Investigate and repair the water leak at Filter 5 Right (5R) filter box. Replace all
media with new media in Filter 5R.
c. For Filters 5 through 8 except for Filter 5R, replenish lost media with new media
to the levels indicated in the design drawings.
d. Demolish Filter 5 & 7 Foundation Fieldbus, replace with District-furnished
instrumentation, and replace and rewire valve boards.
3. Pipe Gallery
a. Demolish Washwater Supply (WWS) tee, flow control valve (FCV), pipe loop
and supports. Furnish and install 24”/20” WWS bypass, supports and valves.
Provide new cross, valves, associated piping, and instrumentation.
b. Demolish polyblend tank, including concrete curbs.
4. Blower Building
a. Replace and provide new switchboard.
5. Operations Building
a. Furnish and install 800A Manual Transfer Switch (MTS) with generator
connection box. Reroute existing, replace and provide new cable.
Estimated cost of this work is between $20M and $25M.
This project will require multiple trades and types of work; for example (note: this list is not all inclusive):
demolition, saw-cutting, concrete coring, hazardous materials handling, grading,
excavation, shoring, fill, concrete, rebar, waterproofing, painting, industrial coatings, structural
steel, bolting, welding, mechanical, electrical, pipeline, plumbing, temporary crane equipment,
handrails, guardrails, gratings and railings, fencing, trucking, paving, and other required work
and trades.
All work covered by the contract shall be completed within one thousand two hundred fifty
(1,250) calendar days after the issuance of the Notice to Proceed.
The contractor/subcontractor performing the electrical work for this contract is required to be a
District pre-qualified electrical subcontractor. See Instructions to Bidders Article 6 for more
information.
EBMUD Contract Equity Program is in effect on this project. District contracting objectives are: Construction 25% White Men; 9% White Women, 25% Ethnic Minorities (Men and Women).