THIS IS AN OVERAA PURSUIT.
This Request for Proposal (RFP) is for a PG&E mission critical facility at Rocklin Distribution Control Center (DCC).
The Rocklin DCC Infrastructure Upgrade Project objective aims to enhance the reliability, security, and redundancy of the existing facility. Scope includes electrical system upgrades, HVAC enhancements, security improvements, and facility expansion to comply with PG&E’s mission-critical infrastructure standards and NERC-CIP (Critical Infrastructure Protection) regulations. The project is scheduled to commence construction by January 2026 and attain In-Service by March 2027.
SCOPE OF WORK:
GENERAL:
-
UPGRADE EXISTING PG&E ROCKLIN DCC (DISTRIBUTION CONTROL CENTER) & GCC (GRID CONTROL CENTER) FACILITY, TO BE IN ALIGNMENT WITH PG&E’S RISK AVERSE MENTALITY & SAFETY PRIORITIES, BY INTRODUCING REDUNDANCY FOR THE EXISTING SYSTEMS
SITE IMPROVEMENTS / CIVIL:
-
MODIFY EXISTING PAVED AREA TO ACCOMODATE NEW BUILDING ADDITION; AS WELL AS CONSTRUCT DOOR LANDINGS, RAMPS AND STAIRS TO ACCESS ADDITION
-
EXPAND EXISTING EQUIPMENT ENCLOSURE, INCLUDING:
1. ADD NEW MASONRY SCREEN WALLS
2. REPLACE EXISTING PAVED/LANDSCAPED AREA WITH NEW GRAVEL
3. INSTALL (2) NEW GENERATORS AND (1) NEW TRANSFORMER
4. CONSTRUCT NEW MANGATE AND MOTORIZED SLIDING GATE
-
INSTALL NEW ELEVATED WALKWAY AT EXISTING LOADING DOCK
ARCHITECTURAL & STRUCTURAL:
-
CONSTRUCT NEW 1-STORY, 1,070 SF ADDITION, WITHIN EXISTING EQUIPMENT ENCLOSURE EAST OF BUILDING. NOTE – ADDITION WILL HOUSE ELECTRICAL EQUIPMENT ONLY, NO OCCUPANTS
-
INFILL OPENINGS AT EXISTING BUILDING WHERE NEW ADDITION IS BEING CONSTRUCTED
ELECTRICAL:
-
INSTALL NEW ELECTRICAL SYSTEM FOR ADDITION INCLUDING EQUIPMENT, POWER AND LIGHTING
-
REMOVE / SALVAGE (1) EXISTING GENERATOR AT LOCATION OF NEW ADDITION
-
INSTALL (2) NEW GENERATORS & (1) NEW TRANSFORMER
MECHANICAL:
-
INSTALL NEW MECHANICAL SYSTEM FOR ADDITION; INCLUDING:
1. (2) DEDICATED, STANDALONE, REDUNDANT HVAC UNITS FED FROM REDUNDANT STANDBY GENERATOR POWER
2. VENTILATION SYSTEM AT UPS ROOM WITH EXHAUST FAN
PLUMBING:
-
INSTALL NEW PLUMBING FOR ADDITION; INCLUDING:
1. CONVENIENCE HOSE BIBB AT ADDITION ROOF
2. BELLY TANK VENTING FOR GENERATORS
NOTE – FIRE ALARM & SPRINKLER SYSTEM SHALL BE DEFERRED SUBMITTALS, UNDER SEPARATE PERMIT
OPTIONAL SITE WALK – PLEASE CONTACT ZAC LUCAS (zacl@overaa.com) TO PARTICIPATE IN A NON-MANDATORY SITE WALK THURSDAY 9/11/2025
California prevailing wages are required. Overaa is signatory to Carpenters and Laborers.
Owner (PG&E) Requirements
1. Bidders who are not ISNET Certified are required to become certified at their own cost prior to construction.
2. Bidders who are not DPI Certified are required to become certified at their own cost prior to construction. Certification is required for any subcontractor who will be excavating, and/or installing work underground or on-grade.
Participation is encouraged from Small Business Enterprises (SBEs); Women, Minority, and Disabled Veteran Business Enterprises (WMDVBEs); and Lesbian, Gay, Bisexual, and Transgender Business Enterprises (LGBTBEs).