San Pablo Dam Road Gateway Improvement Project-Concrete Improvements, San Pablo
The repair and replacement of curbs, sidewalks and curb ramps with minor striping, pavement, and traffic signal work. Additive bid work is included for constructing a cobbled median and related works. Duration: The Project must be completed within 45 working days from the start date set forth in the Notice to Proceed. City anticipates that […]
Windsor SECONDARY TREATMENT SYSTEM UPGRADES PROJECT
General Work Description: The work consists of dewatering the Water Reclamation Facility’s aeration basin, further excavation and installation of a new concrete aeration basin facility with a flow splitting structure, air lines, diffusers, a mixing system, a surface wasting pumping system, and a high flow return pump connected to the adjacent high flow storage pond. […]