General Work Description: The work consists of dewatering the Water Reclamation Facility’s
aeration basin, further excavation and installation of a new concrete aeration basin facility with a flow
splitting structure, air lines, diffusers, a mixing system, a surface wasting pumping system, and a high
flow return pump connected to the adjacent high flow storage pond. In conjunction with the new
aeration basin, a new blower building with internal blowers will be constructed with a separate
electrical control building. Additional work includes a separate carbon feed building with internal
tanks and chemical metering pumps, a below grade secondary clarifier weir flow splitting structure,
and relocation of a concrete sand filter high flow diversion structure.
Disadvantaged Business Enterprise (DBE) participation is encouraged.
Duration: 482 working days with Intermediate Milestones