The work to be done includes:
In general, the work consists of construction of a new 6.0 million gallon AWWA
D110 Type I, strand-wound, prestressed concrete reservoir (Skyview Reservoir
and the associated facility. The work includes but is not necessarily limited to:
 Demolition of the existing reservoir (Skyview Reservoir 1),
 Installing and maintaining erosion and dust control, and storm water
pollution prevention
 Dewatering
 Earthwork cut, fill and compaction
 Site excavation and material movement
 Geotechnical investigation after existing tank has been demolished and
debris removed from site.
 Testing of the existing soils for hazardous material contamination.
 Design of the AWWA D110 Type I tank
 Prestressed concrete steel reinforcement
 Structural concrete tank foundation
 Structural concrete tank walls, roof and vaults
 Tank Liner System
 Steel Ladders, guardrails, handrails, hatches, and tank penetrations,

 Steel piping, valves, supports, and fittings
 Air vents, exhaust fans, pumps, mechanical mixers, sensors, and tank
accessories
 Paintings, coatings and pipe cathodic protection system
 Concrete and Asphalt paving, AB base and subbase preparation
 Curb and gutter, and storm drainage system
 Miscellaneous Concrete
 Steel water lines, fittings and supports
 Site sewer pipe system
 Foundation subdrain system
 Tank electrical, cabling, transmitters, instrumentation and controls
systems
 Exterior site lighting, light poles and enclosed vault lighting
 Gate controllers, card readers, cameras and facility security system
 Fencing, automatic gates,
 Site cleanup and site restoration
The work includes all tie-ins, reconnections, miscellaneous fittings, potholing, soil
testing and investigations, rough and finish grading, backfill, temporary shoring,
miscellaneous steel fabrication, site security, carpentry, rough and finish electrical
work, installing an off-site potable water main located in Goheen Circle, and all
other work and facilities necessary or incidental to construct the completed
improvements as set forth in the plans and specifications and as directed by the
Water Director or her designee.

 

 

This project is subject to A Project Labor Agreement (PLA).

 

Time of completion of the work is 730 calendar days from the date of issuance of the
written notice to proceed by the City.

Location
This project is located near 495 Goheen Circle. Vallejo
Amount
Bid Walk

An optional, but highly encouraged
pre-bid conference will be held October 16 , 2025 @ 09:00 A.M., at the project tank site
at: 495 Goheen Circle, Vallejo, California. Potential bidders shall meet at 495 Goheen
Circle at the designated time and date.

Requirements
This project is subject to A Project Labor Agreement (PLA).
Availability
Documents, including Proposal documents, insurance forms and contract may be inspected and obtained online at: https://www.cityofvallejo.net/doing_business/bids___proposals (note three underscores between “bids” and “proposals”)